Line 4: Line 4:
  
 
* [https://wiki.jlab.org/cuawiki/images/e/e1/CPS_article_rev2.6.pdf CPS Article (almost final?) draft]
 
* [https://wiki.jlab.org/cuawiki/images/e/e1/CPS_article_rev2.6.pdf CPS Article (almost final?) draft]
 +
 +
 +
ACTION ITEMS
 +
 +
* Dose rate at magnet coils - figure out why the dose rate appears to be higher than in earlier simulations
 +
 +
* Article draft - send funding support information to David H, implement additional comments from Bogdan
 +
 +
* Further develop CPS budget for proposal
 +
 +
* Make rough draft for CPS collaboration meeting agenda
 +
 +
 +
DISCUSSION SUMMARY
 +
 +
* Discussion of simulations and prompt coil dose rate
 +
::* Dose rate seems a factor of 50 higher than in earlier calculations
 +
 +
 +
* Discussion about additional comments on the article draft
 +
::* comments from Sean and Donal have been implemented, also a new figure from Gabriel
 +
::* last few sections were re-written
 +
::* Bogdan has additional comments that he will give by email
 +
::* include funding support in acknowledgements
 +
::* need to include the magnet coil dose rate
 +
 +
 +
* Discussion about funding proposal
 +
::* For Phase I a 30 ton shielding may be sufficient
 +
::* Magnet coil cost will depend on final dose rate projection
 +
::* Project defined so that all parts work and detector validated
 +
::* Cost share requirement for all institutions that are not undergrad serving
 +
::* U. Glasgow contribution
 +
 +
 +
* CPS Collaboration Meeting - TUESDAY 4 February 2020 at JLab
 +
::* Possible agenda items:
 +
::::* simulations
 +
::::* design
 +
::::* real changes from Hall A/C to Hall D design
 +
::::* physics (c.f. PAC comments)
 +
::* Make agenda draft for next meeting

Latest revision as of 17:20, 15 November 2019

DISCUSSION MATERIAL


ACTION ITEMS

  • Dose rate at magnet coils - figure out why the dose rate appears to be higher than in earlier simulations
  • Article draft - send funding support information to David H, implement additional comments from Bogdan
  • Further develop CPS budget for proposal
  • Make rough draft for CPS collaboration meeting agenda


DISCUSSION SUMMARY

  • Discussion of simulations and prompt coil dose rate
  • Dose rate seems a factor of 50 higher than in earlier calculations


  • Discussion about additional comments on the article draft
  • comments from Sean and Donal have been implemented, also a new figure from Gabriel
  • last few sections were re-written
  • Bogdan has additional comments that he will give by email
  • include funding support in acknowledgements
  • need to include the magnet coil dose rate


  • Discussion about funding proposal
  • For Phase I a 30 ton shielding may be sufficient
  • Magnet coil cost will depend on final dose rate projection
  • Project defined so that all parts work and detector validated
  • Cost share requirement for all institutions that are not undergrad serving
  • U. Glasgow contribution


  • CPS Collaboration Meeting - TUESDAY 4 February 2020 at JLab
  • Possible agenda items:
  • simulations
  • design
  • real changes from Hall A/C to Hall D design
  • physics (c.f. PAC comments)
  • Make agenda draft for next meeting