Meeting 22 May 2018

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

HOMEWORK

  • Finalize Section VI (Safety and Engineering) - Donal, Dustin, Rolf
  • General idea is to include: 1) Impact of radiation on materials, e.g. target coils, 2) Temperature and cooling, 3) Engineering aspects like weight and installation considerations
  • Add qualifier that not final design
  • Reduce number of bulleted lists
  • Update info on how much material is needed - Jixie simulation, Bogdan/Rolf analytical estimate
  • Include Buckley magnet quote in cost estimate
  • Section I (Summary)
  • Make clear which conclusions directly address the PAC45 questions
  • Add sentence about other experiments that add to CPS science - currently driven by WACS, but there are others, e.g. TCS, ...
  • Section II (Motivation and Science Gain)
  • Some re-shuffling, section/subsection assignment, and different titles to emphasize implications for polarized target when placing CPS near it and relation to science gain
  • Replace target limitation subsection title with something along lines "implications for...", "pushing performance of..", ...


ASSIGNMENTS AND TIMEFRAME - TARGET DATE 31 MAY 2018

  • Start review and editing of sections 1-5 and appendix 1 and 2, review section VI when available after 5/28 (David, Thia)
  • Finalize Section VI by ~5/28 (Donal, Rolf, Bogdan, Jixie)
  • Send corrections, edits for all sections to hornt@cua.edu (all)


MATERIAL USED IN 5/22/18 MEETING:

Discussion of CPS document draft 5/22/18