Meeting 30 July 2021

From Cuawiki
Revision as of 16:35, 30 July 2021 by Hornt (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION ITEMS

  • Rotating target updates
  • Design models, stress/thermal calculations
  • Engineering analysis and planning
  • TCS updates
  • Other


PARTICIPANTS: Amy Comer, Bert Metzger, Bogdan Wojtsekhowski, Brannon Semp, Dustin Keller, Rolf Ent, Hamlet Mkrtchyan, Josh Crafts, Kevin, Marie Boer, Vardan Tadevosyan, Tanja Horn


DESIGN/ENGINEERING (Amy, Bert, Bogdan, Gabriel, Josh)

  • Cooling system work ongoing
  • Power deposition along z has been updated
  • Testing part of absorber
  • Materials
  • First tungsten powder blocks for inner part of magnet arrived
  • Checking on sintered (still have to shim) tungsten blocks - cost increased over years - need to look into optimization of shielding (main focus on front since most radiation there), dimensions roughly ~3"x(4-5)"x6"
  • Change of procurement plan
  • initially hoped that get magnet out for procurement, but will still take
  • move towards tungsten and start procurement of high density tungsten blocks (16 g/cm3) for center region ~20% of blocks needed
  • Action items:
  • Check on number of tungsten blocks needed - with 16 g/cm3 and for earlier block size (2 x 4 x 4) assumption ~19.4 (metric) tons
  • Start the procurement for the inner part of the shielding
  • From later discussion on Tungsten bricks:
  • 19.43 metric tons or ~2109 bricks of 2 x 4 x 4
  • For the larger bricks of Elmet of 3" x 4.125" x 6.2" that would be ~880.


ROTATING TARGET UPDATE (Dustin)

  • Two design options
  • standard - limited to one cup, likely will require frequent changes of bellows (quantify)
  • new - can take more than one cup, design to optimize bellow wear
  • Standard prototype has been built - still needs to be tested (cool down and in beam at NIST)
  • New design does not yet have a prototype
  • Action item: further develop a plan toward realizing a rotating target for the experiments


TCS TRANSVERSE POLARIZED (Brannon)

  • Additional science that could be done within the time of the current C2 approved TCS proposal
  • Need to check rates and backgrounds etc.
  • Action items:
  • focus on removing C2 conditional on TCS proposal first - aim for completing in next four months
  • evaluate experimental details of new science in 2022


NEXT MEETING: FRIDAY 27 AUGUST AT 8AM ET