Meeting 4 December 2018

From Cuawiki
Revision as of 15:14, 6 December 2018 by Hornt (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

ACTION ITEMS

  • (Jixie/Dustin/Donal) Address the comments on compatibilty with polarized target as requested in TAC and in Review Report from Aug 2018, e.g. estimate relative uncertainty of target polarization due to
  • (Jixie) radiation damage caused by electron-positron pair production and target rotation
  • (Dustin) Target rotation (mechanical and local damage) - review the reports by JLab and by Chris Keith and make additions and/or modifications in CPS document as needed
  • (David H.) Overall editing to address report comment that narrative doesn't flow smoothly and errors in the figure captions
  • (David H.) Create an outline of a NIM article in Overleaf
  • (Bogdan/Rolf/Tanja/...) Start more detailed draft of NIM article based on David's outline
  • (Tanja with Dustin/Donal/Gabriel/Igor) Create first draft of an executive summary for a possible NSF Mid-Scale Research Instrumentation proposal


SUMMARY OF THE DISCUSSION

CPS DOCUMENT

  • Discussion about status of document updates:
  • Jixie working on FLUKA simulations on radiation damage estimates - results expected in next two weeks
  • Discussion about uncertainty due to target rotation and local radiation damage
  • if ignore radiation damage, then independent of e-beam - all mechanical motion/shock
  • local radiation damage - examine area of overlap of volume exposed to beam and NMR, if total overlap, then know polarization from NMR
  • practical consideration of how to build coil in relation to target rotation - more loops then smaller signal to noise - test setup in progress


POSSIBLE PUBLICATION IN NIM

  • Start with an outline of sections and then fill in with material from CPS document
  • Aiming for instrumentation paper, so not all pieces of current technical document, e.g. regarding the science, may be needed
  • Aim for putting together an initial draft by 2019 Hall A/C Winter meeting and solicit feedback


CPS CONSTRUCTION

  • Competition is NSF-wide
  • There are two classifications depending on funds requested (RI-1 is $6 million to below $20 million) and two categories within: 1) Implementation (e.g., procurement, assembly, construction, commissioning) and 2) Design (e.g., preparations for future mid-scale and larger scale infrastructure. Compared to regular proposals, a larger emphasis is placed on scientific justification, research community priority, broader impacts, and project execution plan.
  • Preliminary proposals are due on 19 February 2019. Full proposals are due 20 May and by invitation only.
  • Compact Photon Source project would likely be RI-1/Implementation. Favorable points include that CPS offers access to unique science that cannot be done otherwise, is basically ready to go, and has community support. Some brainstorming notes:
  • Exclusive photoproduction with very small cross section, c.f. 12 GeV program initially (rare processes) - isolate very small signal to really understand structure
  • novel technology, gain in science, other applications
  • K_Long also aimed at rare processes, where CPS has huge benefit - may appear as other application in proposal as not yet approved by PAC
  • Include: CPS and polarized target
  • Highest priority: write an executive summary draft - unique science summarized in an easily understandable way for people outside NP. Aim to have a first draft within two weeks


NEXT MEETING: TUESDAY 8 JANUARY 2019 AT 3PM (EST)