Difference between revisions of "Meeting 4 June 2019"

From Cuawiki
Jump to navigation Jump to search
(Created page with "'''ACTION ITEMS''' * Article ::* (Tanja, Rolf, David H.) Make a rough draft using the MSRI pre-proposal and David's cleaned up tech document ::* (All) Assign sections for eve...")
 
Line 27: Line 27:
 
* Discussion of CPS article
 
* Discussion of CPS article
 
::* Should be highest priority to get this out
 
::* Should be highest priority to get this out
 +
 +
* Discussion of plans for TCS conditionally approved proposal
 +
::* No update at the upcoming PAC, but a new LOI (different topic) will be submitted

Revision as of 10:41, 5 June 2019

ACTION ITEMS

  • Article
  • (Tanja, Rolf, David H.) Make a rough draft using the MSRI pre-proposal and David's cleaned up tech document
  • (All) Assign sections for everyone to edit
  • (Bogdan, Gabriel) CPS model for optimizations and porting to Hall D
  • Could be based on Parker's FLUKA studies
  • Should be simple to modify and easy to run - GEANT4 might be best
  • (All) CPS cost review - split out pieces that could be of interest to different funding sources
  • (Rolf, Bogdan, Tanja) Start with spreadsheet from MSRI


Discussion Details

  • Discussion path forward for CPS
  • CPS main components: 1) magnet+insert, 2) "nominal" shielding
  • Funding strategy: review and split out logical pieces and check for items that might give the impression that they are replacing "aging JLab equipment"
  • Need to investigate details of Track 1/Track 2 MRI
  • Discussion CPS modeling
  • Earlier studies done by Parker (FLUKA), Gabriel (GEANT4), Jixie
  • Best would be a simple to modify and to run application - GEANT4?
  • Discussion of CPS article
  • Should be highest priority to get this out
  • Discussion of plans for TCS conditionally approved proposal
  • No update at the upcoming PAC, but a new LOI (different topic) will be submitted