Difference between revisions of "Meeting 8 May 2020"

From Cuawiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
DISCUSSION POINTS
+
'''DISCUSSION POINTS'''
  
 
* Simulations conclusions, updates, and next phase  
 
* Simulations conclusions, updates, and next phase  
 
::* [https://wiki.jlab.org/cuawiki/images/3/33/CPS_next_phase_April.pdf Conclusions and next phase]
 
::* [https://wiki.jlab.org/cuawiki/images/3/33/CPS_next_phase_April.pdf Conclusions and next phase]
 +
::* [https://wiki.jlab.org/cuawiki/images/c/c9/Gn_cps_update_05_20_2020_all.pdf Radiation Simulations Update]
  
 
* Shielding and magnet model CAD (Josh)
 
* Shielding and magnet model CAD (Josh)
::* [https://wiki.jlab.org/cuawiki/CPS_Initial_Design_Model.pptx CPS Initial Design Model]
+
::* [https://wiki.jlab.org/cuawiki/images/d/d2/CPS_Initial_Design_Model.pptx CPS Initial Design Model]
 
+
* [https://wiki.jlab.org/cuawiki/images/8/84/CPS_Positions.pptx Hall A/C model and design/implementation] (Steven, Mike, Paulo)
* Hall A/C model and design/implementation (Steven, Mike, Paulo)
 
  
 
* NPS+CPS experiments
 
* NPS+CPS experiments
  
 
* Other
 
* Other
 +
 +
 +
PARTICIPANTS:
 +
Hamlet Mkrtchyan, Igor, Mike Fowler, Sean Dobbs, Tanja Horn, Paulo Medeiros, Mike CAD, Steven Lassiter, Vardan Tadevosyan, Vladimir Berdnikov, Marie Boer, Rolf Ent, Gabriel Niculescu, Dustin Keller, Donal Day, A Comer
 +
 +
 +
'''SUMMARY NOTES'''
 +
 +
'''RADIATION SIMULATIONS UPDATE''' (Gabriel)
 +
 +
* Conclusion: we are "there" - Picked configuration mk_V
 +
::* No need for pink plastic in front - keep lead there
 +
::* Air in exit channel - important to pump, since would give radiological gases
 +
::* Need gate valve and window to separate scattering chamber from beam line (simulation has entrance window)
 +
 +
 +
'''CONCLUSIONS: BRIDGING SIMULATION AND MECHANICAL DESIGN''' (Rolf, Josh, Tanja)
 +
 +
SUMMARY OF CONCLUSIONS AND SHIELDING SKETCHES
 +
* Listing of radiation and material for mk_V
 +
 +
* Seems to suggest ~50 ton device
 +
 +
* Sketches of shielding configuration: side view, front view (how many bricks there are and how to stack them) - start at z=+5cm and estimate total height (155cm), width (180cm) and length (~200cm)
 +
 +
* Hall D KLong possible configuration
 +
 +
* Position magnet with respect to beam - narrow beam pipe hole (3mm), so need very accurate positioning
 +
::* Perhaps change beam pipe to have tolerance on all sides
 +
::* Mainly need good beam position - need to be able to align to better than 1mm
 +
 +
INITIAL CAD MODEL OF MAGNET AND SHIELDING
 +
 +
* Magnet pole piece is angled to increase the field
 +
::* Note: no field clamp needed for CPS magnet
 +
 +
* Shielding model is still simplified - see action items below
 +
 +
* Next steps:
 +
::* Need to also take into account the assembly - which piece goes in first, plus:
 +
::::* cooling, forces, services to magnet etc.
 +
::::* outer containment for tungsten and poly - container to hold tungsten (stainless steel typically since it is heavy)
 +
::* Division of W-Cu insert should minimize heat transfer between segments
 +
::* Discussion of best way to interface with engineering/design team
 +
::::* Autodesk Inventor - should be able to transfer files
 +
 +
* '''Action Items''' - to address before turning over to engineering/design team
 +
::* Cu-W inserts
 +
::* Form of W blocks - get information from vendor
 +
::* Container for W blocks
 +
 +
 +
'''CPS IN HALL C MODEL PRESENTATION''' (Mike)
 +
 +
* Discussion of the Hall C model including the CPS
 +
 +
* There are interferences - need to further discuss
 +
 +
* '''Action item:''' make ppt slides with screen shots - DONE (see link under Discussion items)
 +
 +
 +
'''NPS+CPS EXPERIMENTS''' (Marie, Dustin, Vardan)
 +
 +
* Ongoing simulation efforts
 +
 +
* Background studies with pi+/pi- generator
 +
 +
* Plan to run several settings to optimize signal/background
 +
 +
 +
'''NEXT MEETING: FRIDAY 29 MAY AT 11:00AM (ET)'''

Latest revision as of 10:07, 11 May 2020

DISCUSSION POINTS

  • Simulations conclusions, updates, and next phase
  • Shielding and magnet model CAD (Josh)
  • NPS+CPS experiments
  • Other


PARTICIPANTS: Hamlet Mkrtchyan, Igor, Mike Fowler, Sean Dobbs, Tanja Horn, Paulo Medeiros, Mike CAD, Steven Lassiter, Vardan Tadevosyan, Vladimir Berdnikov, Marie Boer, Rolf Ent, Gabriel Niculescu, Dustin Keller, Donal Day, A Comer


SUMMARY NOTES

RADIATION SIMULATIONS UPDATE (Gabriel)

  • Conclusion: we are "there" - Picked configuration mk_V
  • No need for pink plastic in front - keep lead there
  • Air in exit channel - important to pump, since would give radiological gases
  • Need gate valve and window to separate scattering chamber from beam line (simulation has entrance window)


CONCLUSIONS: BRIDGING SIMULATION AND MECHANICAL DESIGN (Rolf, Josh, Tanja)

SUMMARY OF CONCLUSIONS AND SHIELDING SKETCHES

  • Listing of radiation and material for mk_V
  • Seems to suggest ~50 ton device
  • Sketches of shielding configuration: side view, front view (how many bricks there are and how to stack them) - start at z=+5cm and estimate total height (155cm), width (180cm) and length (~200cm)
  • Hall D KLong possible configuration
  • Position magnet with respect to beam - narrow beam pipe hole (3mm), so need very accurate positioning
  • Perhaps change beam pipe to have tolerance on all sides
  • Mainly need good beam position - need to be able to align to better than 1mm

INITIAL CAD MODEL OF MAGNET AND SHIELDING

  • Magnet pole piece is angled to increase the field
  • Note: no field clamp needed for CPS magnet
  • Shielding model is still simplified - see action items below
  • Next steps:
  • Need to also take into account the assembly - which piece goes in first, plus:
  • cooling, forces, services to magnet etc.
  • outer containment for tungsten and poly - container to hold tungsten (stainless steel typically since it is heavy)
  • Division of W-Cu insert should minimize heat transfer between segments
  • Discussion of best way to interface with engineering/design team
  • Autodesk Inventor - should be able to transfer files
  • Action Items - to address before turning over to engineering/design team
  • Cu-W inserts
  • Form of W blocks - get information from vendor
  • Container for W blocks


CPS IN HALL C MODEL PRESENTATION (Mike)

  • Discussion of the Hall C model including the CPS
  • There are interferences - need to further discuss
  • Action item: make ppt slides with screen shots - DONE (see link under Discussion items)


NPS+CPS EXPERIMENTS (Marie, Dustin, Vardan)

  • Ongoing simulation efforts
  • Background studies with pi+/pi- generator
  • Plan to run several settings to optimize signal/background


NEXT MEETING: FRIDAY 29 MAY AT 11:00AM (ET)