NPS Assembly

From Cuawiki
Jump to navigation Jump to search

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Cabling - COMPLETE (11/18/2022)

  • Onsite contacts: Yeran, Brad
  • Participants
  • AANL (A.Alikhanyan National Science Laboratory)
  • Mkrtchyan Hamlet
  • Voskanyan Hakob
  • Tadevosyan Vardan
  • Mkrtchyan Arthur
  • CUA (Catholic University of America)
  • Ghandilyan Yeranuhi
  • MSU (Mississippi State Universtiy)
  • Abishek Karki
  • OU (Ohio University)
  • Pramita Tiwari
  • GU (University of Glasgow)
  • Oliver Jevons
  • Gary Penman
  • Bundling
  • putting 12 cables on the ground one by one on
  • tying with zip ties in each 3m
  • making a bundle
  • Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180

Assembly

  • Resources:
  • Overview of the phases of the assembly:
  • crystal stacking - DONE
  • PMT block assembly - DONE
  • Cabling and installation of the big PCBs - DONE
  • preparation for detector checkout - ONGOING
  • detector checkout - February - mid-April 2023
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked, sown here with 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • PMT block assembly - COMPLETE (January 2023)
  • Cabling and installation of the big PCBs - COMPLETE (January 2023)
  • Detector checkout preparations - ONGOING in EEL108
  • onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
  • Steps towards performing the detector tests - outside the calorimeter box:
  • Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
  • Set up DAQ
  • Set up power supplies (HV, LV) and slow controls
  • Detector Checkout - PLANNED for February - mid-April 2023 in EEL108

Mechanical

  • Status Updates
  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)

Magnet

Crystals

  • Overview of crystal properties