Line 22: Line 22:
  
 
* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps]
 
* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps]
 +
::* planned for June 2022
 +
::* onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), U. Glasgow (TBD)
  
 
* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate]
 
* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate]
  
 
* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
 
* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
 +
::* planned for July/August
 +
::* onsite personnel: OU (1-2), AANL (2), CUA (2-3), U. Glasgow (TBD)
  
 
* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet]
 
* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet]

Revision as of 17:19, 18 April 2022

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly

  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • To be completed in May 2022
  • On site personnel: AANL (2), CUA (2-3), DSG (1-2, at the end of May)

Assembly

  • planned for June 2022
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), U. Glasgow (TBD)
  • planned for July/August
  • onsite personnel: OU (1-2), AANL (2), CUA (2-3), U. Glasgow (TBD)

Mechanical

  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

Magnet

Crystals

  • Overview of crystal properties

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)