Difference between revisions of "NPS Collaboration Meeting (online, 2/1-2/2 2021)"
Jump to navigation
Jump to search
(→Agenda) |
|||
Line 1: | Line 1: | ||
== Agenda == | == Agenda == | ||
+ | |||
+ | NOTE: The envisioned format for the discussion, except where noted otherwise, is a brief introduction by the discussion lead for each topic including the status followed by open discussion. | ||
'''Monday 1 February 2021 - online''' | '''Monday 1 February 2021 - online''' | ||
Line 5: | Line 7: | ||
:8:00 -8:10 - Welcome and meeting goals - ''TBD'' | :8:00 -8:10 - Welcome and meeting goals - ''TBD'' | ||
− | :8:10 -8:30 - | + | :8:10 -8:30 - Hall C schedule, rough timeline (formal presentation) - ''TBD'' |
:8:30 -8:50 - NPS in Hall C – mechanical design - ''Discussion lead: TBD'' | :8:30 -8:50 - NPS in Hall C – mechanical design - ''Discussion lead: TBD'' | ||
Line 25: | Line 27: | ||
:8:50 -9:10 - Simulations and software development - ''TBD'' | :8:50 -9:10 - Simulations and software development - ''TBD'' | ||
+ | |||
+ | :8:30 -8:50 - Experiment requirements - ''Discussion lead: TBD'' | ||
:9:10 -9:40 - NPS Assembly Plan (magnet, platform and rails, detector, cabling, …) | :9:10 -9:40 - NPS Assembly Plan (magnet, platform and rails, detector, cabling, …) | ||
− | :9:40 -10:10 - | + | :9:40 -10:10 - Test plans for 1) before moving to hall, 2) in hall |
− | :10:10 -10:40 - NPS To-Do List (Gain Monitoring, Calibrations, Software) - ''TBD'' | + | :10:10 -10:40 - NPS To-Do List (Gain Monitoring, Calibrations, Software) - ''TBD'' |
− | |||
− | |||
== Bluejeans == | == Bluejeans == |
Revision as of 18:51, 3 December 2020
Agenda
NOTE: The envisioned format for the discussion, except where noted otherwise, is a brief introduction by the discussion lead for each topic including the status followed by open discussion.
Monday 1 February 2021 - online
- 8:00 -8:10 - Welcome and meeting goals - TBD
- 8:10 -8:30 - Hall C schedule, rough timeline (formal presentation) - TBD
- 8:30 -8:50 - NPS in Hall C – mechanical design - Discussion lead: TBD
- 8:50 -9:10 - Sensors, HV boards&cables, slow controls - Discussion lead: Detector Support Group
- 9:10 -9:40 - HV, Electronics, DAQ - Discussion lead: TBD
- 9:40 -10:10 - HV Divider anode current - TBD
- 10:10 -10:40 - Detector Frame and Infrastructure - TBD
- 10:40 -11:10 - Crystal stacking strategy - TBD
Tuesday 2 February 2021 - online
- 8:30 -8:50 - Magnet mapping - TBD
- 8:50 -9:10 - Simulations and software development - TBD
- 8:30 -8:50 - Experiment requirements - Discussion lead: TBD
- 9:10 -9:40 - NPS Assembly Plan (magnet, platform and rails, detector, cabling, …)
- 9:40 -10:10 - Test plans for 1) before moving to hall, 2) in hall
- 10:10 -10:40 - NPS To-Do List (Gain Monitoring, Calibrations, Software) - TBD
Bluejeans
Browser: https://bluejeans.com/7578012727
Bluejeans app (https://www.bluejeans.com/downloads): "Join A Meeting" with Meeting ID: 7578012727 (no pass code required)
Phone: 1-888-240-2560 (other numbers: http://bluejeans.com/numbers) Participant code is 7578012727#