Difference between revisions of "NPS Collaboration Meeting (online, 2/2 2023)"

From Cuawiki
Jump to navigation Jump to search
Line 12: Line 12:
 
== Agenda ==
 
== Agenda ==
  
Location: Jefferson Lab. NOTE: different rooms for Thursday and Friday!!
+
Location: Jefferson Lab. NOTE: ROOM change - we will be in ARC231/233 both days!
  
  
Line 56: Line 56:
  
  
'''Friday 3 February 2023 (CEBAF Center RM L210A)'''
+
'''Friday 3 February 2023 (ARC RM231/233)'''
  
 
''Installation Plan''
 
''Installation Plan''

Revision as of 11:43, 2 February 2023

Participants2023

Meeting Summary Notes2023

[Task List 2023]

Zoom Information:

Meeting URL: https://jlab-org.zoomgov.com/j/1616306298?from=addon
Meeting ID: 161 630 6298

Agenda

Location: Jefferson Lab. NOTE: ROOM change - we will be in ARC231/233 both days!


Thursday 2 February 2023 (ARC RM 231/233)

8:00 - 8:10 - Introduction and plan for the day - Tanja Horn (CUA)

Detector status updates

8:10 - 8:20 - Mechanical design status overview - Paulo Medeiros (JLAB)
8:20 - 8:30 - Controls, e.g., temperature, LV, HV, LED, etc. - Aaron Brown (JLAB)
8:30 - 8:40 - LED/VTP trigger - Ben Raydo (JLAB) [1]
8:40 -9:05 - DAQ/electronics [2] - Bob Michaels (JLAB)
9:05 -9:30 - Software development and testing [3] - David Hamilton (U. of Glasgow)
9:30 - 9:50 Break
9:50 -10:00 - Cable assembly - Yeran Ghandilyan [4] (CUA)
10:00 -10:30 - Status of NPS calorimeter [5] - IJCLab-Orsay Team
10:30 -10:40 - Status Detector Cosmics Tests - MMazouz analysis Ohio U. team
10:40 - 11:00 Break

Physics with NPS

11:00 -11:20 - Measuring the polarization of a DVCS recoil proton - Olga Bessidskaia-Bylund (CEA)
11:20 -11:40 - A Search for a Nonzero Strange Form Factor of the Proton at 2.5 GeV2 - Bogdan Wojsekhowski (JLAB)
11:40 -11:55 - Experimental prospects for DDVCS with a new muon detector - Marie Boër, Debaditya Biswas (VTech)
11:55 -12:10 - TCS with transveresly polarized target - Vardan Tadevosyan (AANL)
12:10 - Discussion
13:00 - Adjourn


Friday 3 February 2023 (ARC RM231/233)

Installation Plan

8:10 - 8:20 - Installation Schedule overview - Steven Lassiter (JLAB)
8:20 - 9:30 - Discussion - All
9:30 - 9:50 Break

Checkout with Beam, Run Plan, and preparations for final Readiness Review

9:50 -10:50 - Checkout with beam - DVCS/SIDIS spokespersons
10:50 -11:50 - Run Plan - DVCS/SIDIS spokespersons
11:50 -12:50 - Preparations for final Readiness Review - NPS/DVCS/SIDIS spokespersons
13:00 - Adjourn