Difference between revisions of "NPS ERR"

From Cuawiki
Jump to navigation Jump to search
Line 44: Line 44:
 
* Experiment Safety Assessment Document (ESAD)
 
* Experiment Safety Assessment Document (ESAD)
  
* Manuals
+
* [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Standard Equipment Manual]
  
* NPS How-To and references
+
* NPS How-To and references [https://hallcweb.jlab.org/wiki/index.php/How-to Base Equipment Howtos]
  
 
=== Checklists ===
 
=== Checklists ===

Revision as of 10:40, 8 May 2019

NPS Experimental Readiness Review 2019


Time and Location

  • Date: May 15, 2019
  • Location: CEBAF Center Room L102
  • ERR Charge: NPS ERR Charge
  • ERR Committee: Stepan Stepanyan (chair), Renuka Rajput-Ghoshal, Ben Raydo, Robin Wines, Nathan Baltzell, Lorenzo Zana, Keith Welch, Raffaella De Vita, Valery Kubarovsky, Yves Roblin, Ed Folts (observer), Javier Gomez (observer)

Agenda

Wednesday May 15, 2019

  • 8:30 (30) Executive Session
  • 9:00 (10) Remarks from Chair and Charge - TBD
  • 9:10 (20+10) Charge Items 1, 5: Overview, general requirements, equipment to achieve scientific goals, manpower - Tanja Horn
  • 9:40 (30+15) Charge Items 4, 5, 7, 9: Apparatus ownership, maintenance and control, safety documentation, radiation levels - Steve Wood
  • 10:25 (20) - Coffee Break
  • 10:45 (20+10) Charge Items 2c, 3: Mechanical structures, installation - Steve Lassiter
  • 11:15 (20+10) Charge Items 2a, 3: NPS magnet - Charles Hyde
  • 11:45 (20+10) Charge Items 2b, 3: NPS calorimeter - Carlos Munoz-Camacho
  • 12:15 (20+10) Charge Items 2d-f, 3: Electronics, infrastructure, trigger - Brad Sawatzky
  • 12:45 (75) - Working Lunch
  • 14:00 (10+5) Charge Item 6: Beam commissioning - Jay Benesch
  • 14:15 (20+10) Charge Item 8: Software, reconstruction; Collaboration documented track record - Gabriel Niculescu
  • 14:45 Executive Session
  • 17:30 Close Out

Documentation Drafts

  • Conduct of Operations (COO)
  • Experiment Safety Assessment Document (ESAD)

Checklists

Miscellaneous

  • Installation Plans
  • Beamline and equipment responsibility