NPS ERR Prep 2/1/19
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
MAGNET
- Plan for mapping and running
- Hi-pot testing, hydro testing, checklists, 5 G boundaries and field measurements, controls pre-checked out, measured vs calculated results, safety checks and controls, back out procedures
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals
HALL C - MECHANICAL
- Strengthen bottom support, pivot
- Installation plan
HALL C - POWER AND CABLING
- Timeline for decisions and planning
HALL C - DAQ AND ELECTRONICS
- Trigger Bandwidth - highest rate expected from NPS (collaboration input)
- Dynamic range expected for signals (collaboration input)
HALL C - TRIGGER AND ELECTRONICS
- How software chain handles data rates - online monitoring
- Confirm ~4kHz rate on HMS side