Revision as of 09:27, 27 June 2019 by Hornt (talk | contribs) (Created page with "'''DISCUSSION MATERIAL''' [ PMT module prototype photos] '''ACTION ITEMS''' * PMT module assembly: design a special tool to pull out the PMT? ::* Some concern about what...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION MATERIAL

[ PMT module prototype photos]


ACTION ITEMS

  • PMT module assembly: design a special tool to pull out the PMT?
  • Some concern about what to pull out (initial thought by hand/finger and sturdy enough for that) - after settling perhaps parts are more stuck together, would connector or base come off?
  • Calorimeter: consider including a special transportation frame when entire assembly may be tilted, e.g. during tranportation down truck ramp to experimental hall
  • Fiber side PCB: Question: if fiber in place and remove crystal, can crystal move and break fiber?
  • Detector box:
  • exchanging PMTs on sides: no line of sight, unscrew by feel good enough?
  • bottom of box: leg room? Have only about 18inches, box sits on a platform, bottom plate removable; how to get more space? - modified platform? region between rails with more room? Needs to be checked
  • Chiller for cooling crystals: where to put chiller? - length of cooling lines? size of box? - needs to move with and be protected from radiation - send specifications to S. Lassiter, M. Fowler, P. Medeiro
  • Assembly space - check with Walt Akers: requirements: space with crane acces, electrical power, high voltage, DAQ, table space, quasi clean room/tent, quiet, temperature controlled (AC), how long? summer 2020 (June?) start, ask NPS collaborators to come Sept 2020 for assembly tasks


SUMMARY NOTES

  • Presentation mechanical design
  • new system for fibers
  • no change to cables
  • PMT assembly: design final, one long captive screw, some modifications for support of fiber - metal support
  • Wrapping: horizontal thickness (260um (2x70 + 2x60)), assume no air between crystal and reflective sheet, vertical: 260um (), front face: reflector on plastic frame/connector
  • Pitch aveoli: gap aveoli and crystal, assume 260um +50um wrap, SICCAS: 20.85, CRYTUR: 20.77, so pitch 21mm inner - gap between two crytals 1 mm, gap 0.15mm (SICCAS), 0.23mm (CRYTUR)
  • Shearing on one tower with no gap underneath:
  • simulation assuming ~0.7kg/crystal, 1.4MPa/each stage, shear resistance carbon plate 90MPa, security coeff 64 - very safe
  • simulation (ANSYS) assuming all load supported at bottom plate: 125N down, 36P/2, Max stress 48MPa, Shear res 90MPa, security coeff 2 ->safe but not secure -> need to reduce gap under vertical plates
  • tests in lab:
  • load on tower from top on 3x3 prototype with crystals in it, 76kg (3 columns weight), gap under vertical carbon plates -> no damage
  • alveoli deformation with one crystal: simulation (ANSYS), 4 measurement points, no significant deformation
  • buckling: 1.35 (>1, so ok)
  • remove lower row of crystals -> not a good idea, get shearing since load is not perfectly vertical from top - note in actual, full design crystals share the load - fine in principle since not concentrated load, but distributed (also note HYcal had no problems with stacking)
  • Fiber side crystal: metal ferrule screwed on alumin support at PMT/crystal junction joined to silicon fiber sleeve for fiber, fiber: quartz (stiff)
  • Fiber side PCB: between 2 Al plates, protected with plastic tube, inserted NOT glued in plastic ferrule, plastic to not damage fiber, fiber length: 51cm; fibers can be dismounted, PCB can be dismounted if necessary
  • Interface PCB: have 40 PCBs, cables now routed along top rather than side as before; have done mock up with real dimensions, PCB shifted 15cm vertical of PMT column
  • Electronics input/output:
  • Cooling: crystals, external, heating zones; use chiller + two fans (top/bottom like CCal)
  • Discussion of tasks list:
  • Orsay: provides components and assemblies, e.g. cutting reflective sheets, prefolding, wrapping plastic front part, glue mu metal with plastic support, block PMT assembly; cutting/polishing fibers vs purchase (~21eu/meter) - use bundle of ~100, cut in insert tube then polish all same time
  • JLab/NPS collaboration: assemble remaining components, e.g. wrapping crystals (initial estimate 12min/crystal -> 216 hrs, can likely be reduced), insert column PMT assembly and PCB; Mounting: insert cooling, finalize mounting, mounting (Hall C techs); Cabling: Brad, J. Beaufait et al.