Difference between revisions of "NPS Subsystems"

From Cuawiki
Jump to navigation Jump to search
Line 114: Line 114:
  
 
* [https://wiki.jlab.org/cuawiki/images/4/4c/Pi0_NPS_meeting.pdf Background studies in WACS pi0]
 
* [https://wiki.jlab.org/cuawiki/images/4/4c/Pi0_NPS_meeting.pdf Background studies in WACS pi0]
 +
 +
* [https://wiki.jlab.org/cuawiki/images/3/3c/Root-geant4-eclipse.pdf Setting Up ROOT (and Geant4)
 +
Development Environment on Linux with Eclipse IDE], reach out with questions to [https://wiki.jlab.org/cuawiki/index.php/User:Petrs Petr Stepanov]
  
 
== Experiments ==
 
== Experiments ==

Revision as of 18:03, 15 July 2022

NPS Layout

  • NPS detector carriage assembly (2021)

NPS Magnet

  • Magnet Power Supply requirements:
  • PSU with current greater than 1,100A for some overhead
  • No need for a polarity switch, either for the run or for testing. Simple enough to mechanically swap the leads if needed for testing
  • Assembly (2018-2019)
  • Construction updates
  • Vertical vs horizontal field
  • Effect of field on PMTs
  • Shielding concept
  • Fringe field considerations (2016)

Calorimeter

  • Frame
  • Crystals
  • PMTs and HV dividers
  • High Voltage cables fabrication and testing
  • CAEN HV system testing
  • NPS prototype studies
  • 3x3 prototype report (2019)
  • Initial component studies
  • LED studies - PMT sensitivity (2014)

DAQ and Trigger

  • Initial equipment count and rate estimates (2017)

Controls

  • Control and monitoring screens development
  • Interlock system

Data Analysis

Monte Carlo

Development Environment on Linux with Eclipse IDE], reach out with questions to Petr Stepanov

Experiments

NPS Assembly preparations