Difference between revisions of "CountingHouse2ndFloor"

From CebafUsersGroup
Jump to navigationJump to search
(Created page with 'Some preliminary drawings for the 2nd Floor renovation of the Counting House (planned to begin in May 2012): File:RevisedDesign.jpg File:RevisedDesign-1.jpg [[File:R…')
 
Line 19: Line 19:
 
[[File:Counting-house_layout.pdf]]
 
[[File:Counting-house_layout.pdf]]
  
Questions? Comments? Contact kuhn at jlab.org (Sebastian Kuhn, chair-elect UGBoD) or akers at jlab.org (Walt Akers, Acting Technical Interface Technician).
+
Questions? Comments? Contact kuhn at jlab.org (Sebastian Kuhn, chair-elect UGBoD) or akers at jlab.org (Walt Akers, Acting Technical Interface).

Revision as of 13:50, 11 March 2011

Some preliminary drawings for the 2nd Floor renovation of the Counting House (planned to begin in May 2012):

RevisedDesign.jpg


RevisedDesign-1.jpg


RevisedDesign-2.jpg

The most recent design features a large conference room, surrounded by 15 user work stations. Lockers are provided for users to secure valuables outside of working hours. The computing systems and personnel safety systems are now enclosed to reduce noise and produce a more user friendly environment. Additionally, technical and storage space is provided.

Here is a downloadable .pdf file: File:Counting-house layout.pdf

Questions? Comments? Contact kuhn at jlab.org (Sebastian Kuhn, chair-elect UGBoD) or akers at jlab.org (Walt Akers, Acting Technical Interface).