MediaWiki API result

This is the HTML representation of the JSON format. HTML is good for debugging, but is unsuitable for application use.

Specify the format parameter to change the output format. To see the non-HTML representation of the JSON format, set format=json.

See the complete documentation, or the API help for more information.

{
    "batchcomplete": "",
    "warnings": {
        "main": {
            "*": "Subscribe to the mediawiki-api-announce mailing list at <https://lists.wikimedia.org/mailman/listinfo/mediawiki-api-announce> for notice of API deprecations and breaking changes."
        },
        "revisions": {
            "*": "Because \"rvslots\" was not specified, a legacy format has been used for the output. This format is deprecated, and in the future the new format will always be used."
        }
    },
    "query": {
        "pages": {
            "74": {
                "pageid": 74,
                "ns": 0,
                "title": "SVT RECOVERY PROCDURES",
                "revisions": [
                    {
                        "contentformat": "text/x-wiki",
                        "contentmodel": "wikitext",
                        "*": "Beam trips at 0.5:\n\nSVT HV will trip off automatically upon a halo counter beam trip. On a beam trip, check the FSD status GUI.\n* If it was NOT an HPS halo counter trip, MCC should restore the beam on their own. The HV STATUS indicator should remain green as the bias voltage stays at 180V.\n*# When beam is restored, check that the BPM x and y values at 2H02 are as desired and that beam current is stable at our desired value.\n* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Call MCC, tell them that we will get back to them when we are ready for beam (stay on the line).\n*# The HV STATUS indicator should turn yellow as the bias voltage is ramping down. It will turn red once the bias voltage is at 5V. If this does not happen after about 10 seconds, manually press the 5V button in the SVT Summary GUI. (and call SVT expert)\n*# Once the status indicator turns red, tell the MCC we are ready for beam.\n*# When restored, check that the BPM x and y values at 2H02 are stable as defined in the orbit locks and that halo counter rates are the same as before the trip.\n*# Restore SVT HV. Watch the HV STATUS indicator turn yellow, then green.\n*# Reset the SVT monitoring plots (disconnect and connect). Check the SVT monitoring plots.\n\n\nLong down:\n\nIf beam is down for an extended time (more than 15 minutes) or MCC calls to say beam will be down for an extended time:\n# Press the 5V button in the SVT Summary GUI. Check the HV STATUS indicator turns yellow, then red.\n# Retract the SVT to its 1.5 mm stations, both top and bottom. Check the POSITION STATUS indicator turns red.\n# When beam is restored, check that the BPM x and y values at 2H02 are stable as defined in the orbit locks and that halo counter rates are the same as before the trip.\n# Restore SVT HV. Check the HV STATUS indicator turns yellow, then green.\n# Move the SVT back to 0.5 mm, both top and bottom. Move in steps (1.0, 0.7, 0.5). Watch bias currents and halo counter rates. Check the POSITION STATUS indicator turns green at 0.5 mm.\n# Reset the SVT monitoring plots (disconnect and connect). Check the SVT monitoring plots."
                    }
                ]
            },
            "1": {
                "pageid": 1,
                "ns": 0,
                "title": "The HPS Run Wiki",
                "revisions": [
                    {
                        "contentformat": "text/x-wiki",
                        "contentmodel": "wikitext",
                        "*": "<!--########################################   DOCS   ####################################################-->\n<!--########################################   DOCS   ####################################################-->\n<!--########################################   DOCS   ####################################################-->\n\n\n= Shift Documentation =\n\n{| {{TableStyle1}}\n\n| valign=top |\n\n<!--===[http://www.jlab.org/Hall-B/run-web/hps/phone_numbers.pdf Important Phone Numbers]===-->\n===={{#switchtablink:Phone Numbers|'''Phone Numbers'''}}====\n====[http://www.jlab.org/Hall-B/hpsshifts Shift Schedule]====\n====[https://logbooks.jlab.org/checklists/530 Shift-Taker's Checklist] ====\n====[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]====\n====[https://bta Beam Time Accounting]====\n====[https://docs.google.com/spreadsheets/d/1ZhFAcnOFQSl4mula5C8Oqlv_u7oS_v9Mp9U9Otpouk8/edit#gid=43855609 Run Spreadsheet 2021]  [https://docs.google.com/spreadsheets/d/1Ru4weeIOqtcpebiXKxFGCbPXGWXZF-W2JAolHcpvIFU/edit#gid=43855609  2019],[https://docs.google.com/spreadsheets/d/1X_TfOQyQBv9Ja1IQ5LYImk0sd00eN-d4zzkCwn-CSUM/edit#gid=43855609 2016], [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 2015]====\n====[https://docs.google.com/spreadsheets/d/1grvrNSgFrVZa1qLGMo21hGqIjT7YF414/edit?usp=sharing&ouid=117634099472455266736&rtpof=true&sd=true  2019-2021 HPS triggers descriptions]====\n\n<!--* [[Media:hps_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]\n====[[HPS Upgrade ERR]]====-->\n====[https://www.jlab.org/Hall-B/run-web  COO, ESAD, RSAD] Things to read before shift. ====\n====[https://userweb.jlab.org/~baltzell/hps/hps-expert-shift-demo-small.mp4 Expert shift - refresher video demo] ====\n==== [[Media:HallBRemoteshifts_mode_req_resp.pdf | Remote worker shift - requirements and responsibilities]]==== \n====[[Media:HPS_2021.pdf | HPS 2021 Run discription and beam parameter requirements]]====\n| valign=top |\n\n===Procedures===\n<!--* [[HPS Startup Plan|Startup Plan]]-->\n*[[Media:HPS_beam_estab.pdf|Procedure for establishing physics quality beam]]\n* Commissioning Plans:\n<!--**[[Media:HPS_beamline_comm.pdf|Beamline]]\n**[[Media:HPS_BeamTrip_Studies.pdf|Beam Trips]]-->\n**[[Media:2021_09_03_HPS_trigger_commissioning_plan.pdf | Trigger]] <!--(old: [[Media:HPS_TriggerCommissioning_March2015.pdf|2015]], [[Media:HPS_TriggerCommissioning_July2014.pdf|2014]])-->\n**[[Media:HPS_ECal_Commissioning.pdf|ECal]]\n**[[Media:HPS_SVT_Commissioning.pdf|SVT]]\n** [[Media:Hodo_Comission_2021.pdf|Hodoscope]]\n<!--* [[Media:HPS_BeamTripRecovery.pdf|Beam Trip Recovery]]-->\n<!-- * SVT TOSP ([[Media:hps_svt_tosp_1.pdf|1]],[[Media:hps_svt_tosp_2.pdf|2]],[[Media:hps_svt_tosp_3.pdf|3]])-->\n* [[Media:Accessing_the_tunnel.pdf|Tunnel/Hall Access]]\n* [[Media:Power_Failure_Procedures.pdf|Power Failure]]\n<!--* [[Media:hps_svt_tosp.docx|SVT TOSP]] ([[Media:hps_svt_tosp_1.pdf|1]],[[Media:hps_svt_tosp_2.pdf|2]],[[Media:hps_svt_tosp_3.pdf|3]])-->\n<!--* [[HPS Preliminary Run Schedule|Preliminary Run Schedule]]-->\n<!--* [[HPS Run Coordinator Duties|Run Coordinator Duties]]-->\n<!--* [[Command List Reference]]-->\n\n| valign=top |\n\n===Manuals===\n* [[Media:HarpScanManual.pdf|Harp Scans]]\n* [[Media:WaveFormManual.pdf|Beam Trip Runs]]\n* [[Media:OPS_Manual_SVT.pdf|SVT]]\n* [[Media:ecal_manual.pdf|ECal]] ([[Media:ecal_manual_annex.pdf|Annex]])\n<!--* [https://github.com/JeffersonLab/HPS-NOTES/blob/master/SHIFT/Manuals/hps-daq-operation-manual/OPS-Manual-daq.pdf DAQ]-->\n* [[Media:OPS_Manual_DAQ.pdf|DAQ]]<!--([https://clonwiki.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference CLAS Wiki] ([[HPS DAQ Quick Reference|copy]]))-->\n* [[Media:hps_beamline_manual.pdf|Beamline]] and [[Media:HPS_beamline-2021.pdf|Beamline Drawings]]\n**[[Media:chicane_controls.pdf|Turning Chicane ON/OFF]]\n**[[Media:chicane_settings.pdf|Chicane Settings]]\n**[[Media:chicane_ON_OFF.pdf|Manual Turning Chicane ON/OFF]]\n<!--**[[Media:FSD_Test.pdf|FSD]]\n** [Accessing the FSD GUI]-->\n* [[Media:hps_slow_controls_manual.pdf|Slow Controls]]\n\n| valign=top |\n\n===JLab Logbooks===\n<font size=3>\n* [https://logbooks.jlab.org/book/elog MCC]\n** [https://cebaf.jlab.org/dtm/all-events DTM]\n* [https://logbooks.jlab.org/book/halog Hall-A]\n* [https://logbooks.jlab.org/book/hblog Hall-B]\n* [https://logbooks.jlab.org/book/hclog Hall-C]\n* [https://logbooks.jlab.org/book/hdlog Hall-D]\n</font>\n\n<!--\n|-\n|valign=bottom colspan=2|\n* [[Safety Checklist]]\n* [http://www.jlab.org/Hall-B/notes/clas_notes01/01-016.pdf SAF-111] Hall B Walkthrough\n* [http://www.jlab.org/Hall-B/run-web/hps/COO_HallB-HPS.pdf COO] HPS Conduct of Operations\n* [http://www.jlab.org/Hall-B/run-web/hps/ESAD_HallB-HPS.pdf ESAD] HPS Experiment Safety Assesment Document\n* [http://www.jlab.org/Hall-B/run-web/hps/RSAD_HallB-HPS.pdf RSAD] HPS Radiation Safety Assesment Document\n* [http://www.jlab.org/Hall-B/run-web/hps/Hall-B_ERG.pdf ERG] Hall-B Emergency Response Guidelines\n-->\n\n|}\n\n<!--#######################################  SHORT TERM  #################################################-->\n<!--#######################################  SHORT TERM  #################################################-->\n<!--#######################################  SHORT TERM  #################################################-->\n\n= Short Term Schedule =\n<center><font size=+5>\n''' HPS (E12-11-006) 2021 run, August - November 5 '''<br>\n''' Beam energy 3.74 GeV '''<br>\n''' Important: Document all your work in the logbook! '''<br>\n[https://bluejeans.com/759437905/8110 Bluejeans for Run Meetings on DAY and DAY at 3 pm]\n</font></center>\n\n== RC: Maurik Holtrop, Thursday Nov 4 + Friday: Rafayel Paremuzyan  ==\n* (757) 575-7540  \n* 9 575 7540 from Counting Room\n* Personal cell: +1 (757) 753-7769 \n== PDL:  Valery Kubarovsky ==\n*  (757) 876-1789 \n* 9 876-1789 from Counting Room\n\n== <font color=red> Important instructions </font> ==\n=== <font color=red> * Turn OFF beam before target move!</font> === \n=== <font color=red> * No access to the alcove if the chicane magnet beacon is ON.</font> === \nChicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf].\n=== <font color=red> * Energizing the chicane: Please read the \"Turning Chicane ONN/OFF\" document and ask if anything is not clear. When you pushe the ''' ON''' button  make sure current readbacks will behave as it is described in the scction III \"'''Sequenc details'''\" </font> === \n=== <font color=red> * TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.</font> ===\n=== * [https://bta.acc.jlab.org Fill out BTA] hourly. Click \"Load from EPICS\" to fill the left side, then make sure numbers are correct. If needed edit the entry. ===\nNO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!\n=== * Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.  ===\n<!-- === * <b>For orbit lock positions on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.9). Use the 2.82 mm SVT collimator </font></b> === -->\n=== * <b>For orbit lock positions on <font color=red>2H00(X=1.14,Y=-2.9 and on 2H02(X=-2.5,Y=-1.1). Use the 2.82 mm SVT collimator </font></b> ===\n<!--\n=== * <b>Orbit lock positions for <font color=red> one pass beam</font> are <font color=red>2H00(X=1.14,Y=-2.9) and 2H02(X=-1.8,Y=-1.2). Use the 2.82 mm SVT collimator </font></b> ===\n=== * <b> <font color=red> For 1 pass beam with 70 nA beam current, we should not use the beam blocker. This instruction supersedes the beam blocker requirement in the section \"Important Notes\"  </font></b> ===\n-->\n\nBefore 9/9 this was: 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator \n\n{| {{TableStyle1}} \n\n| valign=top width=50% |\n\n== Run Plan Nov 1 - 5, 2021 ==\n<!-- \n* Restore physics quality beam for the production running at 2-pass, start from the tagger dump (see instructions on the right) \n\n\n* After desired beam profile and positions are \n\n* Special runs: ''' After October 15 morning run ends'''\n** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. \n** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the \n** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events.\n* '''Take production data''':  120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours.\n* '''Setup production data taking''':  Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~1.5% for L0t and L0b. End run and start a new one. \n* We will try to have the beam on FCup. with 8 mm collimator in place, <font color=red> No Halo FSD should be masked at this step. </font>\n** If the beam passes through successfully, then we should ask the beam to be off, and put the 2.88 mm collimator, and do 2H02, SVT top and bottom scans to make sure beam position and profile are good.\n* Start a Moeller run 'hps_1.9_Moller_v2_6.trg' for 4 hours, if statistics will be less than 300M, take another run with Moeller trigger.\n* '''Take production data''': Beam current 70 nA, target 8 um W. Each run should last about 4 hours. Trigger hps_1.9_v2_6.trg. -->\n<!-- * Take one hour Empty target run, with the same current, and the same trigger file. -->\n<!-- * Stright through run:\n** Target out, 50 nA beam, 2H02 harp horizontal wire should come closer to the beam, trigger file hps2021_FEE_straight_v2_2.trg, take 50 M events\n** Target out, 50 nA beam, SVT collimator wire should come closer to the beam, trigger file hps2021_FEE_straight_v2_2.trg, take 50 M events-->\n* Take a production data with '''hps2021_v2_3.trg''' trigger file. The beam current should be '''120 nA''', the target is '''20 um W'''.\n** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font>\n** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm\" </font> \n** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font>\n* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running.\n\n<!-- ===At 8 am on Friday, October 2, beam will be OFF for the pass change. Hall-B goes back to the 2nd-pass, Hall-A takes the 1st-pass=== -->\n\n\n===Hall Access Items (Wednesday, November 3rd):===\n* Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts\n\n<!--\n* Investigate noise in ECal top - Nathan/Ben (4 hours)\n* Replace/relocate the camera on the SVT chiller - Nathan (30 min)\n* Calibration runs before run ends: - DONE!\n*# <del>Random trigger run, 20 um W target, 120 nA beam current, trigger file \"hps_v11_5_random_15kHz.trg\" - 1x4 hour run </del>\n*# <del>Low luminosity run, 8 um target, 120 nA beam current, trigger \"hps_v12_1.trg\" - 2x4 hour runs </del>\n*# <del>SVT bias scan - 2 hours</del>\n*# <del>FEE run, 20 um target, 120 nA, trigger TBD (Nathan) - 1x2 hour run  </del>\n*# ??? <del>Run with different SVT positions, 20 um target, 120 nA beam current,  trigger \"hps_v12_1.trg\" - 8 hours</del>\n*# <del>Straight track run, setup with 2H02 wire, trigger \"hps_v6_FEE_STRAIGHT.trg\" - 1 hour, about 20M events </del>\n-->\n==Every Shift:==\n# Follow the run plan as outlined by RC\n# '''With any issue contact On-Call Experts or RC'''\n# Monitor carefully the SVT bias current (see below for details)\n# If any concern about beam stability, ask MCC if orbit locks are on (they should be ON).\n# Keep shift summary up to date in HBLOG. Record all that happens.\n#* Document any beam condition change and send scaler GUIs to HBLOG\n#* [https://bta.acc.jlab.org Fill out BTA] hourly.  Click \"Load from EPICS\" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the \"Sift information\" tab choose experiment <font color=blue> E12-11-006. </font>. At the end of the shift send BTA to the logbook.\n#* Fill and submit the [https://logbooks.jlab.org/checklists/530 shift checklist in the logbook]\n\n==Every Run:==\n# After \"Go\":  [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy]\n# Update the [https://docs.google.com/spreadsheets/d/1ZhFAcnOFQSl4mula5C8Oqlv_u7oS_v9Mp9U9Otpouk8/edit#gid=43855609 Run Spreadsheet]\n# Log screenshots of:\n#* main scaler_hps display\n#* ECAL FADC rate gui\n#* Trigger rate gui\n#* SVT and HODOSCOPE and ECAL Monitoring pdfs\n# Please watch Hybrid sync GUI for correct status (currently three red lights) and the L0-3 and L4-6 occupancy plots for any empty plots beyond the expected three.\n\n== SVT Bias Currents: ==\n\nShifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:\n# Stop the run.\n# Take the beam away, turn off SVT bias voltages, and wait 10 min.\n# Turn the bias voltages back on.\n# Check that the L0 bias currents have gone back down to ~4 uA\n# Bring back the beam and start a new run.\n\nDo not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure.\n\n== Harp Scan Procedure: ==\n\n# During harp scans, SVT must be retracted (motors/SVT Positioners). HVs on SVT, ECal and Hodoscope should be OFF. \n# Halo counter FSDs (Downstream, HPS Up, and HPS Down) are masked, Beam current 50 nA, Orbit locks running.\n# Perform the HARP scan, log the results.\n# If the beam looks different, you should call beam-line on-call that will advise on the next steps.\n# If the beam looks different, perform SVT wire scan, the target needs to be retracted as well for this one.\n<!--#* '''IMPORTANT, use the bottom SVT wire scan only.''' Top SVT wire is broken.-->\n\n=== Important Notes: ===\n# When re-establishing beam to Hall B after a >1h long downtime follow \"General Guidelines\" on the right and the Beamline Procedures and Manual on the shift documentation page. Do not hesitate to call the beamline expert.\n# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.'''\n# ''' For SVT Operations:'''\n#* From the time beam first comes into the hall until it is being delivered to the Faraday cup with orbit locks on for a known good trajectory, the SVT should be completely off. This is especially important during tuning to the tagger dump, when mis-steering of the beam can result in very high hard neutron backgrounds.\n#*Once stable beam is being delivered to the Faraday cup with orbit locks on for a known good trajectory, and the SVT collimator is in position, the FEBs and hybrids can be powered and operated, but the HV bias for the sensors must remain off.\n#*In order to turn on the HV, the FSD system must be functioning so a beam excursion that hits the collimator will quickly trip off the beam.\n#*Instructions on how to run SVT DAQ [https://confluence.slac.stanford.edu/display/hpsg/2021+DAQ+Instructions]\n#** And while confluence is down, here's a [https://logbooks.jlab.org/entry/3920853 copy of the paper instructions] and a [https://logbooks.jlab.org/entry/3920864 snapshot from confluence a month ago].\n\n| valign=top |\n\n==General Instructions==\n\n<!--===DAQ RECOVERY===\nIf DAQ crashed/broken:\n# For every DAQ crash login into clondaq3 as a clasrun then run the following command \n#* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png])\n# [[HPS DAQ Reboot Procedure|Reboot DAQ completely.]].\n# If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status.-->\n\n===Establishing Physics Quality Beam for HPS:===\n# <font color='red'>'''Make sure SVT is retracted and detectors, SVT, Hodoscope and ECAL are OFF.'''</font>\n# <b>If the beam was off for 4 hours or more or in case of troublesome beam tuning, send a beam to the tagger dump:</b>\n#* Check that beam type is set to \"Photon\" (<tt>HPS_EPICS->Beam->BTA</tt>).\n#* Position \"Blank\" on the beam for the Hall-B collimator  \n#* Ask MCC to turn ON the tagger magnet and then deliver <10 nA beam to the tagger dump.\n#* Follow instructions under \"Procedures\" on the documentation tab for \"Beamline\"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA.\n#* Check the beam position on the tagger viewer, it should be approximately in the center of the screen, see https://logbooks.jlab.org/entry/3915622\n#* Check X/Y positions on BPMs and harps and make sure they are close to the last known values.\n<!--\n#* Check profile using 2C21 and tagger (2C24) harp scans and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3899869],[https://logbooks.jlab.org/entry/3899819])\n#** Positions on both harps should be within 1mm\n#** Width on 2C21 should be <~0.2+/-0.05 mm\n#** Width on tagger harp (2C24) <~0.5 +/- 0.1mm -->\n#* Background levels on harp scans are comparable to those of previous scans.\n<!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]-->\n<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> \n#* If not, turn it on.  Strictly follow the procedure in the beamline manual!-->\n# ''' Before sending a beam to the Faraday cup '''\n#* If HPS chicane must be ON, make sure that chicane GUI says \"Chicane Ready\"\n#* Set Hall-B Collimator to 20 mm.\n#* ''' Check that SVT protection collimator is ON THE BEAM (2.82 mm). If the beam was off for more than 4 hours or the configuration has changed, start with 8 mm'''\n#* HPS target is '''OUT''' and Hodoscope and ECAL HVs are '''OFF'''\n#* SVT is OUT (positions -1.8987 mm for top and -2,2025 for bottom on the main HPS scaler GUI) and bias HV is off (all red/green indicators RED in SVT bias GUI)\n#* If any uncertainty, page the experts\n#* Pay attention to the following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3903361]. Make sure their values don't differ more than 100%. If there is such a difference, tell MCC about this.\n# ''' Send beam to the Faraday cup '''\n#* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and on the 2H00 and 2H02 BPMS.\n#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to restore corrector values. At this point don't accept any CW beam, until the beam spot is visible on Downstream Viewer.\n#* If the MCC operator is not able to tune the beam for more than 15 minutes, then notify RC!\n#* Follow the instructions under \"Procedures\" on the documentation tab for \"Beamline\"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish beam to the electron dump. \n<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b>\n#* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration)<b>, then gradually increase to 100 nA. For orbit lock position values see \"Important instructions\" section at top of the page <!-- on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.90)-->. Use the 2.82 mm SVT collimator. (positions changed 10/3/21 by mg)</font></b>. \n#* Tune beam profile at HPS using measured widths 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Compare the beam profile measured with 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3903891]).\n#* Check and log the beam spot on chromax viewer\n#* The halo counter rates before HPS must be very low: \n#*# Upstream Left and Right, and the tagger counters few 10's of Hz, \n#*# Downstream counters should count <Hz/nA\n#*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 50 Hz/nA [https://logbooks.jlab.org/entry/3696813]\n#* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3696813]\n#* When everything is stable, perform SVT wire scan and compare with the nominal [https://logbooks.jlab.org/entry/3720219]\n#* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates\n#* Insert the 20 um W target (turn beam off first).\n# '''Before accepting the beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.'''\n\n\n<!--\n===SVT Instructions:===\n#<font color='red'>Turn SVT completely OFF (Bias, FEB, Flange) when entering Beam Permit.</font>\n# Before sending a beam to Faraday cup, verify (and page SVT expert if otherwise):\n#* SVT should be open: \"Position\" at 0.000 mm in the main scaler_hps GUI\n#* SVT HV is off: all red/green indicators RED in SVT bias GUI\n# The first time sending a beam to the Faraday cup after the hall is closed, page the SVT expert.\n# Instructions on how to run SVT DAQ [https://confluence.slac.stanford.edu/display/hpsg/2021+DAQ+Instructions]\n-->\n<!--\n===ECAL Instructions:===\n*HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump.\n**Only after a stable beam is established to Faraday Cup HVs can be turned ON.\n*HV should be OFF when running beam studies with Struck scalers with 1 mm wire or tuning collimator position.\n-->\n\n|-\n<!--\n!align=left colspan=2 width=100% style=\"background:#eeeeee;\"|\n==<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>==\n# SVT HV will trip off automatically \n# Check the FSD GUI to see if high rates in the HPS halo counters generated the trip\n#* If it was '''NOT''' an HPS halo counter trip, MCC should restore the beam on their own. As soon beam is back and stable, restore SVT HV.\n#* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Inform MCC that we will get back to them when we are ready for beam.\n#*# Retract the SVT to its 1.5 mm stations, both top and bottom. \n#*# Tell MCC we are ready for the beam.\n#*# Once the beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected.\n#*# Once the beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position.\n#*# Resume data taking.\n-->\n\n|-\n!align=left width=50% style=\"background:#eeeeee;\"|\n\n\n\n|}\n\n<!--#######################################  LONG TERM  #################################################-->\n<!--#######################################  LONG TERM  #################################################-->\n<!--#######################################  LONG TERM  #################################################-->\n\n= Long Term Schedule =  \n\n== RC daily meetings at 3 pm in the counting-house 2nd-floor conference room. ==\nBlueJeans Info:\n\nURL: https://bluejeans.com/759437905/8110\n\nMeeting ID: 759437905\n \n'''[https://hpsweb.jlab.org/mon/HPSRun2021_progress.html Status of the 2021 run]'''\n\n{| {{TableStyle1}}\n\n{| {{TableStyle1}}\n\n| valign=top |\n<!-- *[http://accboard.acc.jlab.org/ Accelerator White Board Schedule]\n*[http://opweb.acc.jlab.org/internal/ops/ops_webpage/run_coord/runcoord_form.php?action=main Weekly Run Coordinator Reports]\n*[http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php MCC Daily Meetings]\n*[http://www.jlab.org/Hall-B/hpsshifts HPS Shift Schedule]\n-->\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\"| '''Run Coordinator'''\n|-\n|  08/23 - 09/01  || Stepan Stepanyan\n|-\n| 09/01 - 09/08  || Stepan Stepanyan\n|-\n| 09/08 - 09/15 || Maurik Holtrop\n|-\n| 09/15 - 09/22 || Rafayel Paremuzyan\n|-\n| 09/22 - 09/29 || Rafayel Paremuzyan\n|-\n| 09/29 - 10/06 || Stepan Stepanyan\n|-\n| 10/06 - 10/13 || Stepan Stepanyan\n|-\n| 10/13 - 10/20 ||  Stepan Stepanyan\n|-\n| 10/20 - 10/27 || Rafayel Paremuzyan\n|-\n| 10/27 - 11/4 ||  Maurik Holtrop\n|}\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\"| '''Physics Division Liaison'''\n|-\n| || Valery Kubarovsky\n|}\n\n| valign=top |\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\" | '''Beamline'''\n|-\n| || Eugene Pasyuk\n|}\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\" | '''SlowControls'''\n|-\n| || Nathan Baltzell\n|}\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\" | '''ECAL/HODOSCOPE'''\n|-\n| || Nathan Baltzell\n|}\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\" | '''DAQ'''\n|-\n| || Sergey Boyarinov\n|}\n<!--Michel Garcon:  Michel Gar&ccedil;on-->\n\n| valign=top |\n\n{| class=wikitable\n!width=300 colspan=2 style=\"background:#ffdead;\" | '''SVT'''\n|-\n| 08/23 - 09/02  || Tim Nelson\n|-\n|09/02 - 10/04 || Cameron Bravo\n|-\n| 10/04 - 10/15 || Vitaliy Fadeyev\n|-\n|10/15  - || Alic Spellman\n|}\n\n|}\n\n\n<!-- --\n<center><font size=2 color=red >Spring 2016 Final @ 2.315 GeV:</font><br></center>.\n[[Image:charge2016.png|center|900px]]\n----\n<center><font size=2 color=red >Spring 2015 Final @ 1 GeV:</font><br></center>.\n[[Image:charge.png|center|900px]]\n-->\n<!--#######################################  MONITORING  #################################################-->\n<!--#######################################  MONITORING  #################################################-->\n<!--#######################################  MONITORING  #################################################-->\n\n= Monitoring =\n{| {{TableStyle1}}\n\n| valign=top width=400|\n<b>Webcams:</b>\n* [http://cctv1.jlab.org Tagger Dump]\n* [http://hallbcam08.jlab.org Faraday Cup]\n** To reboot it, run <tt>beam-viewer-reboot</tt> (open a fresh terminal if error message contains \"proxy\")\n* [http://hallbcam03.jlab.org Alcove, SVT Chiller]\n** To reboot it, run <tt>reboot-svt-camera</tt>\n<!--* [http://cctv10.jlab.org SVT Motors]-->\n\n<!--\n| valign=top width=400|\n<b>Trigger:</b>\n* 1.1 GeV MC Trigger Distributions \n** #Hits: [[Media:0Hit.pdf|0]], [[Media:1Hit.pdf|1]], [[Media:2Hit.pdf|2]], [[Media:3Hit.pdf|3]]\n-->\n\n| valign=top width=400|\n<b>Accelerator:</b>\n* [http://epicsweb.jlab.org Accelerator EPICS-WEB] (offsite access)\n* [https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Status_W_Accel.edl Accelerator Status Page]\n* [https://hallbopi.jlab.org/webopi3.3/w?opi=https://hallbopi.jlab.org/opis/detectors/HPS/scaler_hps.opi HPS EPICS-WEB] (offsite access)\n* [http://clasweb.jlab.org/cgi-bin/HALL_ABC/hall_abc_new.pl End Station Status]\n* [http://www.jlab.org/accel/ops_orientation/useful.html Accelerator Ops 1]\n* [http://www.jlab.org/accel/ops/ops.html Accelerator Ops 2]\n* [http://accboard.acc.jlab.org/ Accelerator White Board Schedule]\n* [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/ Accelerator OPS Documents] \n| valign=top width=400|\n<b>Slow Controls:</b>\n* [[HPS MYA Variables]]\n* [http://clasweb.jlab.org/cgi-bin/epics_history/epics.pl Hall B EPICS Database]\n\n\n| valign=top width=400|\n<b>Online & Offline:</b>\n* [http://hpsweb.jlab.org/dqm DQM]\n* [[Monitoring Gui]]\n* [http://hpsweb.jlab.org/hps-run-webapp/ Run Database]\n* [https://clasweb.jlab.org/rcdb Run Conditions Database]\n* [http://hpsweb.jlab.org/datacat/display/browser HPS Data Catalog]\n* [http://srs.slac.stanford.edu/hudson/view/HPS/job/hps-modules/ Jenkins] / [http://srs.slac.stanford.edu/nexus/index.html#nexus-search;quick~hps-distribution Nexus] / [http://java.freehep.org/svn/repos/hps/list/java/trunk/ SVN]\n* [https://confluence.slac.stanford.edu/display/hpsg/Heavy+Photon+Search+Experiment Confluence]\n* [https://github.com/JeffersonLab/HPS-NOTES/tree/master/SHIFT Shift Docs @ GitHub]\n* [https://hpsweb.jlab.org/mon/HPSRun2021_progress.html Run Progress]\n|}\n\n<!--\n= '''Collaboration''' =\n* [https://confluence.slac.stanford.edu/display/hpsg/Heavy+Photon+Search+Experiment Confluence]\n* Mailing Lists:\n** [https://mailman.jlab.org/pipermail/hps HPS] (JLab)\n** [https://listserv.slac.stanford.edu/cgi-bin/wa?A0=HPS-SOFTWARE HPS-SOFTWARE] (SLAC)\n* [https://jira.slac.stanford.edu/browse/HPSJAVA JIRA HPSJAVA]\n-->\n\n\n<center>\n\n= Phone Numbers =\n<font size=3>\n{| class=wikitable cellpadding=\"10\" cellspacing=\"0\" style=\"border-left:3px solid gray;border-right:3px solid gray;border-bottom:1px solid gray;\"\n!style=\"background:#ffdead;border-bottom:3px solid gray; border-top:3px solid gray\" | '''System/Person''' ||style=\"background:#ffdead;border-bottom:3px solid gray;border-top:3px solid gray\" | '''Pager/Phone Number'''\n|-\n| '''Run Coordinator''' || '''(757) 575-7540''' (cell)\n|-\n| '''Physics Div. Liaison''' || '''(757) 876-1789''' (cell)\n|-\n| '''MCC-OPS''' || '''7048'''\n|-\n| '''Crew Chief''' || '''7045'''\n|- \n|'''Crew Chief''' ||  '''9-879-3367''' (cell)\n|-\n| '''Program Deputy''' || '''9-876-7997''' (cell)\n|-\n|style=\"border-bottom:3px solid gray;\" | '''Gate House Guard''' ||style=\"border-bottom:3px solid gray;\"| '''5822'''\n|-\n| DAQ/Online || (757) 232-6221 <!--(757) 869-2188-->  (cell)\n|-\n|SVT ||  (757) 329-4844 (cell)\n|-\n| ECAL/Hodo || (757) 310-7198 (cell)\n|-\n| Slow Controls || (757) 748-6922 (cell)\n|-\n| Beamline || (757) 303-3996 (cell)\n|-\n|style=\"border-bottom:3px solid gray;\"| Engineering ||style=\"border-bottom:3px solid gray;\"| (757) 748-5048\n|-\n| Hall-B Floor || 5165\n|-\n| Hall-B Space Frame || 5170, 5171\n|-\n| Hall-B Forward Carriage || 5371\n|-\n| Hall-B Counting Room || 5244(Shift1), 5245(Shift2)\n|-\n| Hall-B Counting Room || 5247(Expert), 5502(Target)\n|-\n| Hall-B Counting Room || 5246(RC1), 5126(RC2)\n|-\n|style=\"border-bottom:3px solid gray;\"| Hall-B Gas Shed ||style=\"border-bottom:3px solid gray;\"| 7115\n|}\n</font>\n\n<!--#######################################  REMOTE SHIFTS  ##############################################-->\n<!--#######################################  REMOTE SHIFTS  ##############################################-->\n<!--#######################################  REMOTE SHIFTS  ##############################################-->\n\n= Remote Shifts =\n\n{| {{TableStyle1}}\n\n| valign=top |\n\n=== Overview ===\n* Bluejeans for 24-7 communication with counting house:  https://bluejeans.com/950041022\n* Remote VNC connection instructions:  https://logbooks.jlab.org/entry/3880107\n** All necessary applications should be avaible from the desktop menu (left/right click on the desktop)\n* EPICS GUIs should be accessed '''ONLY''' via the desktop menu or by running <tt>hps_epics_remote</tt>.\n\n=== Tasks ===\n* Fill [https://logbooks.jlab.org/checklists/530 shift checklist]?\n* Upload plots to the [https://logbooks.jlab.org/book/hallb Hall B logbook] once per run\n** EPICS beamline overview screen\n** Trigger GUI\n** ECAL and HODO scaler screens\n* Upload monitoring plots, SVT, ECal, Hodo, Recon, to the logbook at the beginning of the run and after 2-3 hours if run lasts that long (see instructions for storing plots below).\n* Upload downstream viewer and the SVT chiller cameras to the logbook no more than once per shift\n* No need to store MYA strip charts unless it is to indicate a problem\n* Monitor beam quality\n** EPICS overview screen \n*** In VNC or [https://hallbopi.jlab.org/webopi3.3/w?opi=detectors/HPS/scaler_hps.opi Web Browser]\n** Strip charts\n*** In VNC or Web Browser: [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&pv=scaler_cS6b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&start=2020-08-08+09%3A02%3A36&end=2020-08-08+09%3A07%3A36&scaler_cS4blabel=scaler_cS4b&scaler_cS4bcolor=%231f78b4&scaler_cS4byAxisLabel=&scaler_cS4byAxisMin=&scaler_cS4byAxisMax=&scaler_cS4byAxisLog=&scaler_cS4bscaler=&scaler_cS5byAxisLabel=&scaler_cS5byAxisMin=&scaler_cS5byAxisMax=&scaler_cS5byAxisLog=&scaler_cS5bscaler=&scaler_cS6blabel=scaler_cS6b&scaler_cS6bcolor=%2333a02c&scaler_cS6byAxisLabel=&scaler_cS6byAxisMin=&scaler_cS6byAxisMax=&scaler_cS6byAxisLog=&scaler_cS6bscaler=&scaler_cS7byAxisLabel=&scaler_cS7byAxisMin=&scaler_cS7byAxisMax=&scaler_cS7byAxisLog=&scaler_cS7bscaler=&scaler_cS12blabel=scaler_cS12b&scaler_cS12bcolor=%23e31a1c&scaler_cS12byAxisLabel=&scaler_cS12byAxisMin=&scaler_cS12byAxisMax=&scaler_cS12byAxisLog=&scaler_cS12bscaler=&scaler_cS13blabel=scaler_cS13b&scaler_cS13bcolor=%23fdbf6f&scaler_cS13byAxisLabel=&scaler_cS13byAxisMin=&scaler_cS13byAxisMax=&scaler_cS13byAxisLog=&scaler_cS13bscaler=&scaler_cS14blabel=scaler_cS14b&scaler_cS14bcolor=%23ff7f00&scaler_cS14byAxisLabel=&scaler_cS14byAxisMin=&scaler_cS14byAxisMax=&scaler_cS14byAxisLog=&scaler_cS14bscaler=&scaler_cS15blabel=scaler_cS15b&scaler_cS15bcolor=%23cab2d6&scaler_cS15byAxisLabel=&scaler_cS15byAxisMin=&scaler_cS15byAxisMax=&scaler_cS15byAxisLog=&scaler_cS15bscaler= Upstream/Midstream Halo Counters], [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Downstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scalerS8b&pv=scalerS9b&scalerS8blabel=scalerS8b&scalerS8bcolor=%23a6cee3&scalerS8byAxisLabel=Rate++%28Hz%29&scalerS8byAxisMin=&scalerS8byAxisMax=&scalerS8byAxisLog&scalerS8bscaler=&pv=scalerS10b&pv=scalerS11b&scalerS9blabel=scalerS9b&scalerS9bcolor=%231f78b4&scalerS9byAxisLabel=&scalerS9byAxisMin=&scalerS9byAxisMax=&scalerS9byAxisLog=&scalerS9bscaler=&scalerS10blabel=scalerS10b&scalerS10bcolor=%23b2df8a&scalerS10byAxisLabel=&scalerS10byAxisMin=&scalerS10byAxisMax=&scalerS10byAxisLog=&scalerS10bscaler=&scalerS11blabel=scalerS11b&scalerS11bcolor=%2333a02c&scalerS11byAxisLabel=&scalerS11byAxisMin=&scalerS11byAxisMax=&scalerS11byAxisLog=&scalerS11bscaler= Downstream Halo Counters], [https://epicsweb.jlab.org/wave/?start=2020-07-08+16%3A50%3A02&end=2020-07-08+16%3A55%3A02&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Beam+Currents&fullscreen=false&layoutMode=2&viewerMode=2&pv=IPM2C21A&pv=IPM2C24A&pv=scaler_calc1b&IPM2C21Alabel=IPM2C21A&IPM2C21Acolor=%23a6cee3&IPM2C21AyAxisLabel=Beam+Current+%28nA%29&IPM2C21AyAxisMin=0&IPM2C21AyAxisMax=300&IPM2C21AyAxisLog&IPM2C21Ascaler=&scaler_calc1blabel=Faraday+Cup&scaler_calc1bcolor=%23b2df8a&scaler_calc1byAxisLabel=&scaler_calc1byAxisMin=&scaler_calc1byAxisMax=&scaler_calc1byAxisLog&scaler_calc1bscaler= Beam Currents], [https://epicsweb.jlab.org/wave/?start=2020-08-03+12%3A30%3A57&end=2020-08-03+12%3A35%3A57&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=BPM+Positions+%28Y-Axis+is+mean+%2B%2F-+0.5+mm%29&fullscreen=false&layoutMode=3&viewerMode=2&pv=IPM2C24A.XPOS&pv=IPM2C24A.YPOS&pv=IPM2H01.XPOS&pv=IPM2H01.YPOS&IPM2C24A.XPOSlabel=IPM2C24A.XPOS&IPM2C24A.XPOScolor=%23e31a1c&IPM2C24A.XPOSyAxisLabel=&IPM2C24A.XPOSyAxisMin=-2.0&IPM2C24A.XPOSyAxisMax=+1.0&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=pink&IPM2C24A.YPOSyAxisLabel=&IPM2C24A.YPOSyAxisMin=-2.0&IPM2C24A.YPOSyAxisMax=1.0&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=darkgreen&IPM2H01.XPOSyAxisLabel=&IPM2H01.XPOSyAxisMin=-2.0&IPM2H01.XPOSyAxisMax=1.0&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=lightgreen&IPM2H01.YPOSyAxisLabel=&IPM2H01.YPOSyAxisMin=-2.0&IPM2H01.YPOSyAxisMax=1.0&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler=#a6cee3&IPM2C24A.XPOSyAxisLabel=2C24+X+(mm)&IPM2C24A.XPOSyAxisMin=-1.5&IPM2C24A.XPOSyAxisMax=-0.5&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=%231f78b4&IPM2C24A.YPOSyAxisLabel=2C24+Y+(mm)&IPM2C24A.YPOSyAxisMin=0.3&IPM2C24A.YPOSyAxisMax=1.3&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=pink&IPM2H01.XPOSyAxisLabel=2H01+X+(mm)&IPM2H01.XPOSyAxisMin=-0.6&IPM2H01.XPOSyAxisMax=0.4&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=darkred&IPM2H01.YPOSyAxisLabel=2H01+Y+(mm)&IPM2H01.YPOSyAxisMin=0.4&IPM2H01.YPOSyAxisMax=1.4&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler= BPM Positions]\n* Monitor data quality\n**''Note, for image quality, these windows should be maximized when saving the plots to PDF.''\n** On any clon machine as user=hpsrun, these commands will run the different monitoring suites: \n***  ECAL:  <tt>startEcalMonitoring</tt> - [https://logbooks.jlab.org/files/2021/09/3904322/14210ecal.pdf Reference Plots for Comparison, Updated September 11]\n***  HODO:  <tt>startHodoMonitoring</tt>\n***   SVT:  <tt>startSVTCheckout</tt>\n*** Recon:  <tt>startReconMonitoring</tt>\n** Collect at least 10 min of data before saving the plots\n** Before saving plots, please maximze the monitoring app window to the screen in order to get a good quality plots\n** Please save monitoring plots into following sub-direcories\n*** ECal Monitoring:                   /home/hpsrun/ECalMonitoring/\n*** SVT Monitoring:                    /home/hpsrun/svt_monitoring/\n*** Hodoscope Monitoring:        /home/hpsrun/HodoMonitoring/\n*** Recon Monitoring:                /home/hpsrun/svt_monitoring/\n** In order for SVT occupancies to be useful, they must be acquired without beam trips.\n** See [[Monitoring Gui]] for description of how GUI works\n* Communicate with the shift expert about issues with any of the above\n<!--\n* Online Full Reconstruction (work in progress)\n** jas3 or http://clonfarm11.jlab.org:8080/HPSRecon/\n*** '''Insert link to a good reference here'''\n** [[Online Recon - Expert|Expert]]\n-->\n\n| valign=top |\n\n== Shift Worker Backup Table ==\nTo add your name, edit this wiki page or send email to Maurik or Nathan.\n {| class=wikitable\n!width=600 colspan=4 style=\"background:#ffdead;\"| '''Worker Shift Backup'''\n|-\n| style=\"background:#ffdead;\"|  '''Date''' || style=\"background:#ffdead;\"|  '''Day''' || style=\"background:#ffdead;\"| '''Swing''' || style=\"background:#ffdead;\"| '''Owl''' \n|-\n| Tue, Oct 12 || Annalisa D'Angelo || Gabriele Simi || Andrea Celentano  \n|-\n| Wed, Oct 13 || Glasgow || Luca Marsicano || Annalisa D'Angelo  \n|-\n| Thu, Oct 14 || Glasgow || Andrea Celentano || Annalisa D'Angelo  \n|-\n| Fri, Oct 15 ||  Glasgow || Mariangela Bond\u00ec || Annalisa D'Angelo  \n|-\n| Sat, Oct 16 ||  Glasgow || Mariangela Bond\u00ec || Annalisa D'Angelo  \n|}\n\n {| class=wikitable\n!width=600 colspan=3 style=\"background:#deffad;\"| '''Backup shifter contact info'''\n|-\n| style=\"background:#deffad;\"|  '''Name''' || style=\"background:#deffad;\"|  '''Email''' || style=\"background:#deffad;\"| '''Cell phone'''  \n|-\n| Annalisa D'Angelo || annalisa.dangelo@roma2.infn.it || +393473634490/(call\nthrough WhatsApp if not reachable)\n|-\n| Alessandra Filippe || filippi@to.infn.it || +39 328 9411758 \n|-\n| Andrea Celentano || andrea.celentano@ge.infn.it || \u202d+39 340 9831283\u202c\n|-\n| Domenico D'Urso  ||  ddurso@uniss.it || +39 349 3630 242\n|-\n| Gabriele Simi || gabriele.simi@pd.infn.it || +39 320 748 3385\n|-\n| Hakob Voskania || voskania@jlab.org  || +37495909998\n|-\n| Luca Marsicano || luca.marsicano@ge.infn.it || +39 333 9893725\u202c\n|-\n| Mariangela Bond\u00ec || mariangela.bondi@ge.infn.it || +39 \u202d327 1895733\u202c\n|-\n| Marzio de Napoli || marzio.denapoli@ct.infn.it || +39-3498834468\n|-\n| Maurik Holtrop || holtrop@jlab.org || +1-603-868-8088  \n|-\n| Natasa Dashyan || natasha@jlab.org  || +37477538360\n|-\n| Nathan Baltzell || baltzell@jlab.org || +1 757 748 6922\n|-\n| Nunzio Randazzo || nunzio.randazzo@ct.infn.it || +39-3472591331\n|-\n| Raffaella De Vita || Raffaella.Devita@ge.infn.it || +39 340 8110156\n|- \n| Rapha\u00ebl Dupr\u00e9 || raphael.dupre@ijclab.in2p3.fr || +33 670 977 761\n|-\n| Rouven Essig ||  rouven.essig@stonybrook.edu || \n|-\n| Silvia Niccolai || silvia@jlab.org || +33 624 81 67 78\n|- \n| Valeria Sipala || vsipala@uniss.it  || +39 339 339 57 04\n|-\n|}\n\n|}\n\n<headertabs />\n__NOEDITSECTION__\n__NOTOC__\n\n{| {{TableStyle1}}\n| valign=top style=\"text-align:center\"|\n[[Image:svtpic.png|300px]]\n| valign=top style=\"text-align:center\"|\n[[Image:ecalpic.png|300px]]\n|}"
                    }
                ]
            }
        }
    }
}