Difference between revisions of "HPS 2016 Trigger Commissioning"

From hps run
Jump to navigation Jump to search
Line 1: Line 1:
 
Two sets of runs, each at 3 different beam currents
 
Two sets of runs, each at 3 different beam currents
 +
 
* The 3 beam currents are
 
* The 3 beam currents are
 
** 20 nA (or lower)
 
** 20 nA (or lower)
 
** 100 nA
 
** 100 nA
 
** 200 nA
 
** 200 nA
 +
 
# ECal Pedestal Runs at 3 beam currents
 
# ECal Pedestal Runs at 3 beam currents
 
# 20 kHz Pulser-Only at 3 beam currents
 
# 20 kHz Pulser-Only at 3 beam currents

Revision as of 18:41, 1 February 2016

Two sets of runs, each at 3 different beam currents

  • The 3 beam currents are
    • 20 nA (or lower)
    • 100 nA
    • 200 nA
  1. ECal Pedestal Runs at 3 beam currents
  2. 20 kHz Pulser-Only at 3 beam currents