Difference between revisions of "HPS 2016 Trigger Commissioning"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
# ECal Pedestal Runs | # ECal Pedestal Runs | ||
− | # 20 kHz Pulser | + | # 20 kHz Pulser Runs |
− | #* | + | #* 100 Million event (~1 hour) at each beam current: |
− | + | #** 20 kHz Pulser at 20 nA (or lower) | |
− | + | #** 20 kHz Pulser at 100 nA | |
− | # 20 nA (or lower) | + | #** 20 kHz Pulser at 200 nA |
− | # 100 nA | ||
− | # 200 nA | ||
The pedestal runs should be done first so that they can be | The pedestal runs should be done first so that they can be |
Revision as of 19:51, 1 February 2016
Two types of runs:
- ECal Pedestal Runs
- 20 kHz Pulser Runs
- 100 Million event (~1 hour) at each beam current:
- 20 kHz Pulser at 20 nA (or lower)
- 20 kHz Pulser at 100 nA
- 20 kHz Pulser at 200 nA
- 100 Million event (~1 hour) at each beam current:
The pedestal runs should be done first so that they can be