Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 213: Line 213:
 
| April 23 - April 29 || Raphael Dupre
 
| April 23 - April 29 || Raphael Dupre
 
|-
 
|-
| April 30 - May 6
+
| April 30 - May 6 || Takashi Maruyama
 
|}
 
|}
  
Line 297: Line 297:
 
!colspan=2 style="background:#ffdead;" | ECAL On-Call
 
!colspan=2 style="background:#ffdead;" | ECAL On-Call
 
|-
 
|-
| March 1-9 || A. Celentano
+
| March 1 - March 9 || A. Celentano
 
|-
 
|-
| March 9-23 || N. Baltzell
+
| March 9 - March 23 || N. Baltzell
 
|-
 
|-
| March 23-30 || H. Szumila
+
| March 23 - March 30 || H. Szumila
 
|-
 
|-
 
| March 30-April 13 || G. Charles
 
| March 30-April 13 || G. Charles
 
|-
 
|-
| April 13-20 || R. Dupre
+
| April 13 - April 20 || R. Dupre
 
|-
 
|-
| April 20-27 || M. Garcon
+
| April 20 - April 27 || M. Garcon
 
|-
 
|-
 
| April 27 - May 4 || H. Szumila
 
| April 27 - May 4 || H. Szumila

Revision as of 10:44, 24 February 2015

[edit]

RC: Takashi Maruyama

  • (757) 575-7540
  • 9 575 7540 from Counting Room

PDL: Harut Avagyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change
  5. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Dec. 8 - Dec. 10

Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates.

  • Re-establish CW 1 pass beam to the Hall-B dump, setting beam to specified settings at the dump screen and the 2H02 harp. Chicane off. 5 nA.
  • Study the dependence of halo counter rates on beam position. Vary x and y of beam by +/- 7.5 mm, with beams parallel to specified settings above.

Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible.

  • With beam at nominal, set up chicane to specified currents for the -7% field point. Instructions provided in Counting House. Verify harp scan and record

location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates.

  • Ditto for -9% beam position.
  • If little change in scaler rates, use -7% setting as chicane standard. If large improvement in scaler rates in going to -9%, try -11%.
  • Select standard chicane settings.
  • Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current. Call Stepan before first use of target.
  • With 1.5 um Pt target, measure scalers and Ecal occ vs beam current.Record Ecal Scalers and scalaer display for each beam current.
  • If time allows, begin commissioning the Ecal and trigger with beam on target and data taking.
  • Expect beam off Tuesday day shift for machine studies. Beam recovery starts on Swing.
Beam
Energy ~2.0 GeV
Current < 200.0 nA CW
Position
X Y
~0 mm ~0 mm
Profile
X Y
< 0.1 mm < 0.1 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
March 1 - March 11 Stepan Stepanyan
March 12 - March 18 Francios-Xavier Girodl
March 19 - April 1 John Jaros
April 2 - April 8 Nathan Baltzell
April 9 - April 15 Takashi Maruyama
April 16 - April 22 Maurik Holtrop
April 23 - April 29 Raphael Dupre
April 30 - May 6 Takashi Maruyama
Physics Division Liaison
X - Harut Avakian
DATE NAME





DAQ On-Call
March 1-9 Expert #1
ECAL On-Call
March 1 - March 9 A. Celentano
March 9 - March 23 N. Baltzell
March 23 - March 30 H. Szumila
March 30-April 13 G. Charles
April 13 - April 20 R. Dupre
April 20 - April 27 M. Garcon
April 27 - May 4 H. Szumila
SVT On-Call
March 1-9 Expert #1
SlowControls On-Call
March 1-9 Expert #1