Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 95: | Line 95: | ||
== Run Plan: Nov. 9 - Nov. 10 == | == Run Plan: Nov. 9 - Nov. 10 == | ||
− | <font size=+ | + | <font size=+14>Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine. </font> |
{| | {| |
Revision as of 11:06, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine.
|
|
|
|