Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 103: | Line 103: | ||
!colspan=2 style="background:#ffdead;" | Beam | !colspan=2 style="background:#ffdead;" | Beam | ||
|- | |- | ||
− | | Energy || | + | | Energy || ~2.0 GeV |
|- | |- | ||
| Current || 0.0 nA | | Current || 0.0 nA |
Revision as of 11:13, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine.
|
|
|
|