Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 105: | Line 105: | ||
| Energy || ~2.0 GeV | | Energy || ~2.0 GeV | ||
|- | |- | ||
− | | Current || | + | | Current || < 200.0 nA CW |
|- | |- | ||
|colspan=2 style="background:#e0e0e0;" | Position | |colspan=2 style="background:#e0e0e0;" | Position | ||
Line 111: | Line 111: | ||
| X || Y | | X || Y | ||
|- | |- | ||
− | | +0 mm || -0 mm | + | | \sigma +0 mm || -0 mm |
|- | |- | ||
|colspan=2 style="background:#e0e0e0;" | Profile | |colspan=2 style="background:#e0e0e0;" | Profile |
Revision as of 11:18, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine.
|
|
|
|