Line 97: | Line 97: | ||
<font size="3">Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine. </font> | <font size="3">Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine. </font> | ||
− | * Follow procedures in the "[https://wiki.jlab.org/hps-run/images/0/0d/HPS_beamline_commissioning.pdf Beamline commissioning plan]" | + | * Follow procedures in the "[https://wiki.jlab.org/hps-run/images/0/0d/HPS_beamline_commissioning.pdf Beamline commissioning plan]". Tuning beam to tagger dump is covered under item (A). Depending machine status items (A.7) and (A.8) may not feasible to complete at this time. |
+ | * The beam parameters at 2C24/tagger harp needed to deliver HPS requested beam ("pancake") on target in downstream alcove are outlined in A. Freybergers [[Media:document]] need for | ||
{| | {| |
Revision as of 11:34, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine.
|
|
|
|