Line 98: | Line 98: | ||
* Follow procedures in the "[https://wiki.jlab.org/hps-run/images/0/0d/HPS_beamline_commissioning.pdf Beamline commissioning plan]". Tuning beam to tagger dump is covered under item (A). Depending on the machine state, items (A.7) and (A.8) may not be feasible to complete at this time. | * Follow procedures in the "[https://wiki.jlab.org/hps-run/images/0/0d/HPS_beamline_commissioning.pdf Beamline commissioning plan]". Tuning beam to tagger dump is covered under item (A). Depending on the machine state, items (A.7) and (A.8) may not be feasible to complete at this time. | ||
− | * The beam parameters at 2C24/tagger harp needed to deliver HPS requested beam ("pancake") on target in downstream alcove are outlined in A. Freyberger's [ | + | * The beam parameters at 2C24/tagger harp needed to deliver HPS requested beam ("pancake") on target in downstream alcove are outlined in A. Freyberger's "[http://www.jlab.org/Hall-B/run-web/hps/manuals/HPS_Beamline.pdf]" |
{| | {| |
Revision as of 11:49, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to th eHall-B tagger dump and with beam parameters on 2C24 harp (tagger harp) (x and Y width and S/N on halo counters from harp wire) close to values obtained with 6 GeV machine.
|
|
|
|