Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 100: | Line 100: | ||
* First establish [http://clasweb.jlab.org/clasonline/servlet/newloginfo?action=logentry&entryId=41734 6-GeV era quality beam] <font color=red> X/Y width ~<150 micron, and S/N on halo counters from harp wire >10E4</font> on tagger (2C24) harp. | * First establish [http://clasweb.jlab.org/clasonline/servlet/newloginfo?action=logentry&entryId=41734 6-GeV era quality beam] <font color=red> X/Y width ~<150 micron, and S/N on halo counters from harp wire >10E4</font> on tagger (2C24) harp. | ||
* Then, using optics setting used in A. Freyberger's "[http://www.jlab.org/Hall-B/run-web/hps/manuals/HPS_Beamline.pdf]" simulations, achieve needed beam parameters at 2C24/tagger harp to deliver HPS requested beam ("pancake") on target in downstream alcove. | * Then, using optics setting used in A. Freyberger's "[http://www.jlab.org/Hall-B/run-web/hps/manuals/HPS_Beamline.pdf]" simulations, achieve needed beam parameters at 2C24/tagger harp to deliver HPS requested beam ("pancake") on target in downstream alcove. | ||
− | ** <font color=blue>In order to do above program, when CW beam is established, Hall-B beam halo counters and harps (2C21 and 2C24 or tagger) must be calibrated first. So it may take multiple harp scans to set harp motion limits and halo counter PMT gains. With any issue contact beam line expert | + | ** <font color=blue>In order to do above program, when CW beam is established, Hall-B beam halo counters and harps (2C21 and 2C24 or tagger) must be calibrated first. So it may take multiple harp scans to set harp motion limits and halo counter PMT gains. With any issue contact beam line expert or RC. </font> |
{| | {| |
Revision as of 15:19, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get CW stable beam to the Hall-B tagger dump, on 2C24 harp (tagger harp) achieve beam parameters routinely delivered to Hall-B in 6-GeV era X/Y width ~<150 micron, and S/N on halo counters from harp wire >10E4.
|
|
|
|