Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
* Re-establish CW 1 pass beam to the Hall-B tagger dump | * Re-establish CW 1 pass beam to the Hall-B tagger dump | ||
− | * Work with MCC crew to establish small size stable beam at the tagger - beam parameters X/Y width ~< | + | * Work with MCC crew to establish small size stable beam at the tagger - beam parameters <font color=red> X/Y width ~<100 micron, and S/N on halo counters from the harp wire >10E4</font>. |
* Perform harp scans using 2C21 and tagger (2C24) harps. | * Perform harp scans using 2C21 and tagger (2C24) harps. | ||
*Then, using optics setting used in [[Media:HPS_Beamline.pdf|A. Freyberger's simulations]], achieve needed beam parameters at 2C24/tagger harp to deliver HPS requested beam ("pancake") on target in downstream alcove. | *Then, using optics setting used in [[Media:HPS_Beamline.pdf|A. Freyberger's simulations]], achieve needed beam parameters at 2C24/tagger harp to deliver HPS requested beam ("pancake") on target in downstream alcove. |
Revision as of 17:37, 14 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|