== Run Plan: Nov. 9 - Nov. 10 ==
+
== Run Plan: Nov. 14 - Nov. 17 ==
 
'''<font size=3>Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump. </font>'''
 
'''<font size=3>Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump. </font>'''
  
Line 100: Line 100:
 
* Work with MCC crew to establish small size stable beam at the tagger - beam parameters <font color=red> X/Y width ~<100 micron, and S/N on halo counters from the harp wire >10E4</font>.
 
* Work with MCC crew to establish small size stable beam at the tagger - beam parameters <font color=red> X/Y width ~<100 micron, and S/N on halo counters from the harp wire >10E4</font>.
 
* Perform harp scans using 2C21 and tagger (2C24) harps.  
 
* Perform harp scans using 2C21 and tagger (2C24) harps.  
*Then, using optics setting used in [[Media:HPS_Beamline.pdf|A. Freyberger's simulations]], achieve needed beam parameters at 2C24/tagger harp to deliver HPS requested beam ("pancake") on target in downstream alcove.
+
*Then, ask to change the optics to get HPS requested, "ribbon", beam at 2C24 harp, <font color=red> X~150 micron,  Y<50 micron</font>.
 +
* Perform harp scans using 2C21 and tagger (2C24) harps.  
 
** <font color=blue>In order to do above program, when CW beam is established, Hall-B beam halo counters and harps (2C21 and 2C24 or tagger) must be calibrated first. So it may take multiple harp scans to set harp motion limits and halo counter PMT gains. With any issue contact Beamline Expert or RC. </font>  
 
** <font color=blue>In order to do above program, when CW beam is established, Hall-B beam halo counters and harps (2C21 and 2C24 or tagger) must be calibrated first. So it may take multiple harp scans to set harp motion limits and halo counter PMT gains. With any issue contact Beamline Expert or RC. </font>  
  

Revision as of 17:40, 14 November 2014

[edit]

RC: Stepan Stepanyan

PDL: Harut Avagyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Nov. 14 - Nov. 17

Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.

  • Re-establish CW 1 pass beam to the Hall-B tagger dump
  • Work with MCC crew to establish small size stable beam at the tagger - beam parameters X/Y width ~<100 micron, and S/N on halo counters from the harp wire >10E4.
  • Perform harp scans using 2C21 and tagger (2C24) harps.
  • Then, ask to change the optics to get HPS requested, "ribbon", beam at 2C24 harp, X~150 micron, Y<50 micron.
  • Perform harp scans using 2C21 and tagger (2C24) harps.
    • In order to do above program, when CW beam is established, Hall-B beam halo counters and harps (2C21 and 2C24 or tagger) must be calibrated first. So it may take multiple harp scans to set harp motion limits and halo counter PMT gains. With any issue contact Beamline Expert or RC.
Beam
Energy ~2.0 GeV
Current < 200.0 nA CW
Position
X Y
~0 mm ~0 mm
Profile
X Y
< 0.3 mm < 0.3 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
DATE NAME
DATE NAME
DATE NAME
DATE NAME
Physics Division Liaison
DATE NAME
DATE NAME
DATE NAME
DATE NAME