Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 96: | Line 96: | ||
| valign=top | | | valign=top | | ||
− | == Run Plan: | + | == Run Plan: Dec. 4 - Dec. == |
− | '''<font size=3>Upstream beamline commissioning and beam optics and stability studies using the tagger dump | + | '''<font size=3>Upstream beamline commissioning and beam optics and stability studies using the tagger dump. The goal is to get CW, stable beam to the Hall-B tagger dump. </font>''' |
* Re-establish CW 1 pass beam to the Hall-B tagger dump | * Re-establish CW 1 pass beam to the Hall-B tagger dump |
Revision as of 16:26, 2 December 2014
[edit]
RC: Nathan Baltzell
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Dec. 4 - Dec.Upstream beamline commissioning and beam optics and stability studies using the tagger dump. The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|