* Establish CW 1 pass beam to the Hall-B  dump, including checkout of all new beamline components, BPMs, quads, correctors, and harps.
 
* Establish CW 1 pass beam to the Hall-B  dump, including checkout of all new beamline components, BPMs, quads, correctors, and harps.
* Work with MCC crew to establish small size stable beam at the alcove harp - beam parameters <font color=red> sig X ~ 150 micron, sig Y ~50 micron, with low noise in the downstream halo counters and ecal.  
+
* Work with MCC crew to establish small size stable beam at the alcove harp - beam parameters sig X ~ 150 micron, sig Y ~50 micron, with low noise in the downstream halo counters and ecal.  
 
* Perform harp scans using 2H02 harp. Optimize halo counter voltages as needed.
 
* Perform harp scans using 2H02 harp. Optimize halo counter voltages as needed.
 
* Once established, commission the chicane magnet, including a study of noise rates (halo counters + ecal) vs B field. (We may need to run slightly lower than nominal B for our given beam energy to afford adequate clearance to the 3 inch beam pipe connected to the new target assembly.The beam pipe must accommodate both straight through and Frascati bent beams.)
 
* Once established, commission the chicane magnet, including a study of noise rates (halo counters + ecal) vs B field. (We may need to run slightly lower than nominal B for our given beam energy to afford adequate clearance to the 3 inch beam pipe connected to the new target assembly.The beam pipe must accommodate both straight through and Frascati bent beams.)

Revision as of 20:46, 6 December 2014

[edit]