Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 38: Line 38:
 
** [https://clonwiki.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference CLAS Wiki] ([[HPS DAQ Quick Reference|copy]])
 
** [https://clonwiki.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference CLAS Wiki] ([[HPS DAQ Quick Reference|copy]])
 
* [[Media:hps_beamline_manual.pdf|Beamline]]
 
* [[Media:hps_beamline_manual.pdf|Beamline]]
 +
**[[Media:chicane_ON-OFF.pdf|Turning ON/OFF chicane]]
 
* [[Media:hps_slow_controls_manual.pdf|Slow Controls]]
 
* [[Media:hps_slow_controls_manual.pdf|Slow Controls]]
  
Line 64: Line 65:
  
 
|}
 
|}
 
  
 
= '''Short Term Schedule''' =
 
= '''Short Term Schedule''' =

Revision as of 17:09, 8 December 2014

[edit]

RC: John Jaros

  • (757) 575-7540
  • 9 575 7540 from Counting Room

PDL: Harut Avagyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change
  5. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Dec. 7 - Dec. 9

Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates.

  • Establish CW 1 pass beam to the Hall-B dump, including checkout of all new beamline components, BPMs, quads, correctors, and harps.
  • Work with MCC crew to establish small size stable beam at the alcove harp - beam parameters sig X ~ 150 micron, sig Y ~50 micron, with low noise in the downstream halo counters and ecal.
  • Perform harp scans using 2H02 harp. Optimize halo counter voltages as needed.
  • Once good beam is established, commission the chicane magnet, including a study of noise rates (halo counters + ecal) vs B field. (We may need to run slightly lower than nominal B for our given beam energy to afford adequate clearance to the 3 inch beam pipe connected to the new target assembly.The beam pipe must accommodate both straight through and Frascati bent beams.)
  • Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current.
  • If time allows, begin commissioning the Ecal and trigger with beam on target and data taking.
Beam
Energy ~2.0 GeV
Current < 200.0 nA CW
Position
X Y
~0 mm ~0 mm
Profile
X Y
< 0.1 mm < 0.1 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
X - Nov 19 Stepan Stepanyan
Nov 19 - Dec 3 Nathan Baltzell
Dec 3 - 9 John Jaros
Dec 9 - 22 Takashi Maruyama
Physics Division Liaison
X - Harut Avakian
DATE NAME