− | == Run Plan: Dec. | + | == Run Plan: Dec. 8 - Dec. 10 == |
'''<font size=3> Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates. </font>''' | '''<font size=3> Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates. </font>''' | ||
− | * | + | * Re-establish CW 1 pass beam to the Hall-B dump, setting beam to specified settings at the dump screen and the 2H02 harp. Chicane off. 5 nA. |
− | * | + | * Study the dependence of halo counter rates on beam position. Vary x and y of beam by +/- 7.5 mm, with beams parallel to specified settings above. |
− | * | + | Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible. |
− | * | + | * With beam at nominal, set up chicane to specified currents for the -7% field point. Instructions provided in Counting House. Verify harp scan and record |
− | * Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current. | + | location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates. |
+ | * Ditto for -9% beam position. | ||
+ | * If little change in scaler rates, use -7% setting as chicane standard. If large improvement in scaler rates in going to -9%, try -11%. | ||
+ | * Select standard chicane settings. | ||
+ | * Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current. Call Stepan before first use of target. | ||
+ | * With 1.5 um Pt target, measure scalers and Ecal occ vs beam current.Record Ecal Scalers and scalaer display for each beam current. | ||
* If time allows, begin commissioning the Ecal and trigger with beam on target and data taking. | * If time allows, begin commissioning the Ecal and trigger with beam on target and data taking. | ||
** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ||
− | ** With any issue, contact Beamline Expert or RC.</font> | + | ** With any issue, contact Beamline Expert, Ecal Expert, DAQ Expert or RC.</font> |
{| | {| |