Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 249: | Line 249: | ||
<b>Slow Controls:</b> | <b>Slow Controls:</b> | ||
* [[HPS MYA Variables]] | * [[HPS MYA Variables]] | ||
− | * [http://clasweb.jlab.org/cgi-bin/epics_history/epics.pl | + | * [http://clasweb.jlab.org/cgi-bin/epics_history/epics.pl Hall B EPICS Database] |
− | |||
| valign=top width=400| | | valign=top width=400| | ||
Line 261: | Line 260: | ||
| valign=top width=400| | | valign=top width=400| | ||
− | |||
− | |||
− | |||
− | |||
− | |||
* [http://srs.slac.stanford.edu/DataCatalog/ HPS Data Catalog] | * [http://srs.slac.stanford.edu/DataCatalog/ HPS Data Catalog] | ||
Revision as of 08:02, 4 March 2015
[edit]
HPS Phone/Pager NumbersChecklists
|
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Dec. 8 - Dec. 10Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates.
Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible.
location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates.
|
|
|
|
Webcams: (only accessible inside Hall gateway)
|
Slow Controls: |
Accelerator
|
|
|
|
|