Difference between revisions of "HPS 2016 Trigger Commissioning"

From hps run
Jump to navigation Jump to search
Line 1: Line 1:
 
Two types of runs:
 
  
 
# ECal Pedestal Runs
 
# ECal Pedestal Runs

Revision as of 18:55, 1 February 2016

  1. ECal Pedestal Runs
    • 20 nA (or lower)
    • 100 nA
    • 200 nA
  2. 20 kHz Pulser Runs
    • 100 Million event (~1 hour) at each beam current:
      • 20 nA (or lower)
      • 100 nA
      • 200 nA

Ideally the pedestal runs should be done first so that they can be used
to update the pedestals used for the 20 kHz Pulser runs. This requires
an ECal expert available and to then update the trigger files for the
subsequent Pulser runs. If this is not the case, the Pulser runs can be
done first.