Difference between revisions of "HPS 2016 Trigger Commissioning"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | |||
− | |||
# ECal Pedestal Runs | # ECal Pedestal Runs |
Revision as of 18:55, 1 February 2016
- ECal Pedestal Runs
- 20 nA (or lower)
- 100 nA
- 200 nA
- 20 kHz Pulser Runs
- 100 Million event (~1 hour) at each beam current:
- 20 nA (or lower)
- 100 nA
- 200 nA
- 100 Million event (~1 hour) at each beam current:
Ideally the pedestal runs should be done first so that they can be used
to update the pedestals used for the 20 kHz Pulser runs. This requires
an ECal expert available and to then update the trigger files for the
subsequent Pulser runs. If this is not the case, the Pulser runs can be
done first.