Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 72: | Line 72: | ||
| valign=top | | | valign=top | | ||
− | == | + | ==RC: Stepan Stepanyan== |
+ | == PDL: Harut Avagyan == | ||
<font size=+2>Stepan Stepanyan</font> | <font size=+2>Stepan Stepanyan</font> | ||
Revision as of 11:04, 9 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanStepan Stepanyan Every Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine
|
|
|
|