Line 124: | Line 124: | ||
| X || Y | | X || Y | ||
|- | |- | ||
− | | < 0. | + | | < 0.1 mm || < 0.1 mm |
|} | |} | ||
Revision as of 17:40, 14 November 2014
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 14 - Nov. 17Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|