Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 73: | Line 73: | ||
== RC: Stepan Stepanyan == | == RC: Stepan Stepanyan == | ||
− | == PDL: Harut Avagyan == | + | 757 575 7540 |
+ | == PDL: Harut Avagyan == | ||
Revision as of 15:50, 17 November 2014
[edit]
RC: Stepan Stepanyan757 575 7540 PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 14 - Nov. 17Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|