Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 72: | Line 72: | ||
| valign=top width=300 | | | valign=top width=300 | | ||
− | == RC: | + | == RC: Nathan Baltzell == |
*(757) 575-7540 | *(757) 575-7540 | ||
*9 575 7540 from Counting Room | *9 575 7540 from Counting Room |
Revision as of 20:25, 19 November 2014
[edit]
RC: Nathan Baltzell
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 14 - Nov. 17Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|