Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 193: Line 193:
 
!colspan=2 style="background:#ffdead;"| '''Run Coordinator'''
 
!colspan=2 style="background:#ffdead;"| '''Run Coordinator'''
 
|-
 
|-
| - Nov 19 || Stepan Stepanyan
+
| X - Nov 19 || Stepan Stepanyan
 
|-
 
|-
 
| Nov 19 - Dec 3 || Nathan Baltzell
 
| Nov 19 - Dec 3 || Nathan Baltzell
Line 199: Line 199:
 
| Dec 3 - 9 || John Jaros
 
| Dec 3 - 9 || John Jaros
 
|-
 
|-
| Dec 9 - Dec 22 || Takashi Maruyama
+
| Dec 9 - 22 || Takashi Maruyama
 
|}
 
|}
  
Line 207: Line 207:
 
!colspan=2 style="background:#ffdead;"| '''Physics Division Liaison'''
 
!colspan=2 style="background:#ffdead;"| '''Physics Division Liaison'''
 
|-
 
|-
| DATE || NAME
+
| DATE || Harut Avakian
 
|-
 
|-
 
| DATE || NAME
 
| DATE || NAME

Revision as of 07:24, 3 December 2014

[edit]

RC: Nathan Baltzell

  • (757) 575-7540
  • 9 575 7540 from Counting Room

PDL: Harut Avagyan

Every Shift:

  1. Follow run plan as outlined by RC
  2. Keep shift summery up-to-date in HBLOG
  3. Document any beam condition change and send scaler GUIs to HBLOG
  4. Continuously check quality of data

Every Run:

  1. a
  2. b
  3. c
  4. d


MCC Daily Meetings


Run Plan: Dec. 4 - Dec.

Upstream beamline commissioning and beam optics and stability studies using the tagger dump. The goal is to get CW, stable beam to the Hall-B tagger dump.

  • Re-establish CW 1 pass beam to the Hall-B tagger dump
  • Work with MCC crew to establish small size stable beam at the tagger - beam parameters X/Y width ~<100 micron, and S/N on halo counters from the harp wire >10E4.
  • Perform harp scans using 2C21 and tagger (2C24) harps.
  • Then, ask to change the optics to get HPS requested, "ribbon", beam at 2C24 harp, X~150 micron, Y<50 micron.
  • Perform harp scans using 2C21 and tagger (2C24) harps.
    • In order to do above program, when CW beam is established, holo counters and harps must be first calibrated.
    • It may take multiple harp scans to set harp motion limits and halo counter PMT gains.
    • See Full PDF, Click Here
    • With any issue, contact Beamline Expert or RC.
Beam
Energy ~2.0 GeV
Current < 200.0 nA CW
Position
X Y
~0 mm ~0 mm
Profile
X Y
< 0.1 mm < 0.1 mm
Target
#1 0 mm
Magnets
PS Current 0 A
Chicane Dipole #1 0 A
Chicane Dipole #2 0 A
DAQ
Configuration ___________________
Configuration file
Prescales
Thresholds
Events Per Run
Dead Time



AccumulatedCharge.png


Run Coordinator
X - Nov 19 Stepan Stepanyan
Nov 19 - Dec 3 Nathan Baltzell
Dec 3 - 9 John Jaros
Dec 9 - 22 Takashi Maruyama
Physics Division Liaison
DATE Harut Avakian
DATE NAME
DATE NAME
DATE NAME