Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 97: | Line 97: | ||
| valign=top | | | valign=top | | ||
− | == Run Plan: Dec. | + | == Run Plan: Dec. 8 - Dec. 10 == |
'''<font size=3> Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates. </font>''' | '''<font size=3> Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates. </font>''' | ||
− | * | + | * Re-establish CW 1 pass beam to the Hall-B dump, setting beam to specified settings at the dump screen and the 2H02 harp. Chicane off. 5 nA. |
− | * | + | * Study the dependence of halo counter rates on beam position. Vary x and y of beam by +/- 7.5 mm, with beams parallel to specified settings above. |
− | * | + | Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible. |
− | * | + | * With beam at nominal, set up chicane to specified currents for the -7% field point. Instructions provided in Counting House. Verify harp scan and record |
− | * Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current. | + | location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates. |
+ | * Ditto for -9% beam position. | ||
+ | * If little change in scaler rates, use -7% setting as chicane standard. If large improvement in scaler rates in going to -9%, try -11%. | ||
+ | * Select standard chicane settings. | ||
+ | * Commission the HPS target, including measuring noise rates in the Ecal and halo counters vs beam current. Call Stepan before first use of target. | ||
+ | * With 1.5 um Pt target, measure scalers and Ecal occ vs beam current.Record Ecal Scalers and scalaer display for each beam current. | ||
* If time allows, begin commissioning the Ecal and trigger with beam on target and data taking. | * If time allows, begin commissioning the Ecal and trigger with beam on target and data taking. | ||
** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ||
− | ** With any issue, contact Beamline Expert or RC.</font> | + | ** With any issue, contact Beamline Expert, Ecal Expert, DAQ Expert or RC.</font> |
{| | {| |
Revision as of 20:49, 8 December 2014
[edit]
HPS Phone/Pager NumbersChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Dec. 8 - Dec. 10Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates.
Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible.
location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates.
|
|
|
|
Webcams only accessible inside Hall gateway. |