Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 82: | Line 82: | ||
# Document any beam condition change and send scaler GUIs to HBLOG | # Document any beam condition change and send scaler GUIs to HBLOG | ||
# Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | # Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | ||
+ | # Fill out shift checklist in the logbook, HBLOG, using template | ||
# Continuously check quality of data | # Continuously check quality of data | ||
==<font color=red size=+2>Every Run:</font>== | ==<font color=red size=+2>Every Run:</font>== | ||
Line 96: | Line 97: | ||
| valign=top | | | valign=top | | ||
− | == Run Plan: | + | == Run Plan:March 5 - 6 == |
− | '''<font size=3> | + | '''<font size=3> Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties. </font>''' |
* Re-establish CW 1 pass beam to the Hall-B dump, setting beam to specified settings at the dump screen and the 2H02 harp. Chicane off. 5 nA. | * Re-establish CW 1 pass beam to the Hall-B dump, setting beam to specified settings at the dump screen and the 2H02 harp. Chicane off. 5 nA. |
Revision as of 21:38, 4 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 5 - 6Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
Record scaler rates, BPMs, 2H02 harp, and beam location on dump screen. Choose nominal position close to rate minimum, at old nominal, if possible.
location on dump screen. Tweak Frascati current if necessary, and record. Record scaler rates.
|
|
|
|
|
|
|
|