Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 108: | Line 108: | ||
** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ** See <b>[[Media:dec4_beamline_commissioning.pdf|Full PDF, Click Here]]</b> | ||
− | * Ask MCC to deliver oval shape beam at tagger (2C24) harp: x-width ~250 um, y-width << x-width, and tilt angle ~0 | + | * Ask MCC to deliver oval shape beam at tagger (2C24) harp: x-width ~250 um, y-width << x-width, and tilt angle ~0 (if tuning is going to be too long, more than an hour, use whatever asymmetri beam is available) |
− | * Continue with 2C24 (tagger) harp scans to check beam tilt angle motion over time, as well as beam position and width stability | + | * Continue with 2C24 (tagger) harp scans to check beam tilt angle motion over time, as well as beam position and width stability - ~4 hours with scans every 1/2 hour |
+ | * Study beam tails as a function of current. Position x(y) wire left then right (above then bellow) of beam center at ~3\sigma increase beam current up to 200 nA and record halo counter rates. It is expected to see linear increase of rates if increasing the current does not effect beam profile | ||
+ | * Repeat above for position 5\sigma away from the beam center | ||
{| | {| |
Revision as of 14:35, 7 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 6 - 7Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|