Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 110: | Line 110: | ||
* Ask MCC to deliver oval shape beam at tagger (2C24) harp: x-width ~250 um, y-width << x-width, and tilt angle ~0 (if tuning is going to be too long, more than an hour, use whatever asymmetri beam is available) | * Ask MCC to deliver oval shape beam at tagger (2C24) harp: x-width ~250 um, y-width << x-width, and tilt angle ~0 (if tuning is going to be too long, more than an hour, use whatever asymmetri beam is available) | ||
− | * Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~ | + | * Continue with 2C24 (tagger) harp scans at 10 nA to check beam tilt angle motion over time, as well as beam position and width stability - ~5 hours (till about 7am) with scans every 1/2 hour |
* Study beam tails as a function of current - every 2 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | * Study beam tails as a function of current - every 2 hours increase beam curent to 100 nA and perform tagger harp scan. <b> for harps analysis use tagger right and upstream left </b> | ||
Revision as of 00:49, 8 March 2015
[edit]
Important Phone NumbersShift ScheduleChecklists |
Procedures |
Manuals |
JLab Logbooks
|
RC: Stepan Setpanyan
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan:March 6 - 7Setup Beam to Hall-B Tagger Dump and Studies of Beam Properties.
|
|
|
|
|
|
|
|