HPS 2016 Trigger Commissioning
Jump to navigation
Jump to search
Two sets of runs, each at 3 different beam currents.
The 3 beam currents are 20 nA (or lower), 100 nA, and 200 nA.
- ECal Pedestal Runs at 3 beam currents
- 20 kHz Pulser-Only at 3 beam currents