HPS 2016 Trigger Commissioning

From hps run
Revision as of 18:48, 1 February 2016 by Baltzell (talk | contribs)
Jump to navigation Jump to search

Two types of runs:

  1. ECal Pedestal Runs
  1. 20 kHz Pulser
    • One Hour / 100 Million events at each beam current

Each at 3 different beam currents:

  1. 20 nA (or lower)
  2. 100 nA
  3. 200 nA

The pedestal runs should be done first so that they can be