HPS 2016 Trigger Commissioning
Jump to navigation
Jump to search
Two types of runs:
- ECal Pedestal Runs
- 20 kHz Pulser Runs
- 100 Million event (~1 hour) at each beam current:
- 20 kHz Pulser at 20 nA (or lower)
- 20 kHz Pulser at 100 nA
- 20 kHz Pulser at 200 nA
- 100 Million event (~1 hour) at each beam current:
The pedestal runs should be done first so that they can be