The HPS Run Wiki
[edit]
- Shift Documentation
- Short Term Schedule
- PDL: Harut Avagyan
- Long Term Schedule
- Accelerator
- Monitoring
RC: Stepan StepanyanEvery Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine
|
|
|
|