The HPS Run Wiki
Jump to navigation
Jump to search
[edit]
RC: Stepan StepanyanPDL: Harut AvagyanStepan Stepanyan Every Shift:
Every Run:
|
Run Plan: Nov. 9 - Nov. 10Upstream beamline commissioning and beam tune using the tagger dump (beam will not go through the Hall). The goal is to get beam parameters on 2C24 harp (tagger harp) close to values obtained with 6 GeV machine
|
|
|
|