The HPS Run Wiki
[edit]
RC: Stepan Stepanyan757 575 7540 PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Nov. 14 - Nov. 17Upstream beamline commissioning and beam optics and stability studies using the tagger dump (beam will not go through the Hall). The goal is to get CW, stable beam to the Hall-B tagger dump.
|
|
|
|