The HPS Run Wiki
Jump to navigation
Jump to search
[edit]
RC: John Jaros
PDL: Harut AvagyanEvery Shift:
Every Run:
|
Run Plan: Dec. 7 - Dec. 9Beamline commissioning studies using the Hall B dump, followed by studies of the ECal and Trigger. The goal is to get usable CW beam to the Hall-B dump, set up the chicane, and begin to study beam backgrounds and trigger rates.
|
|
|
|
Webcams only accessible inside Hall gateway. |