Difference between revisions of "HPS 2016 Trigger Commissioning"

From hps run
Jump to navigation Jump to search
Line 2: Line 2:
 
== Phase 0:  Diagnostics ==
 
== Phase 0:  Diagnostics ==
 
# One Run with Singles & Pairs Triggers
 
# One Run with Singles & Pairs Triggers
#* trigger file:  HPS/Run2016/v0.trg
+
#* trigger file:  '''<tt>HPS/Run2016/v0.trg</tt>'''
 
#* 30 minutes at any current
 
#* 30 minutes at any current
  

Revision as of 02:16, 6 February 2016

Phase 0: Diagnostics

  1. One Run with Singles & Pairs Triggers
    • trigger file: HPS/Run2016/v0.trg
    • 30 minutes at any current

Phase 1: Preliminary Tuning

  1. ECal Pedestal Runs
    • About 10 minutes at each beam current:
      • 25 nA (or lower)
      • 100 nA
      • 200 nA
  2. 20 kHz Pulser Runs
    • trigger file: HPS/Run2016/pulser20kHz.trg
    • At least 100 Million events (~1 hour) at each beam current:
      • 25 nA (or lower)
      • 100 nA
      • 200 nA

Ideally the pedestal runs should be done first so that they can be used
to update the pedestals used for the 20 kHz Pulser runs. This requires
an ECal expert available, and to then update the trigger files for the
subsequent Pulser runs. If this is not the case, the Pulser runs can be
done first with the preconfigured pedestals.


Phase 2: Final Tuning

coming soon